Laserfiche WebLink
ELECTRIC <br />crvice <br />❑ GwundworA <br />❑ SlablConduil <br />❑ Rough In <br />❑ Service <br />❑ GrounAin9 <br />❑ eiling Grid <br />lectrical Pinal <br />SI E WORK <br />❑ Fooling drains <br />❑ Roof drains <br />OTHER OR CONSUL <br />INSPECTION REPORT <br />Date:� —O z „— Perm^ � �� ����0 <br />Contractor: <br />Owner: <br />TYPE OF INSPECTION FEOUESTED <br />BUILDING <br />❑ UFER ground <br />❑ Fooling <br />❑ Foundalion <br />❑ Struclural 51ab <br />❑ Framing <br />❑ Insulation <br />❑ Drywall Nailing <br />❑ Shcar Naiiing <br />❑ Rool Nailing <br />❑ Ceiling Grid <br />❑ Bullding Final <br />MEChANICAL <br />❑ Groundwork/Slab <br />❑ Rough In <br />0 Ceiling Grid <br />❑ OK lo insulate <br />❑ Rooflop Units <br />❑ Mechanfcal Final <br />GAS PIPE <br />❑ Rou9h InlService <br />❑ Refrigeration <br />❑ Gas Pipe Final <br />PLUMBING <br />�] GroundworklSlab <br />[] Rough In <br />❑ Ceiling Grid <br />❑ OK �o insulate <br />❑ Water Servicc <br />❑ Medic�l Gas <br />❑ Plumbing Final <br />Hol Water TanY, <br />❑ Rou91i In <br />❑ HWT Final <br />—�APPROVAL ❑PARTI�LAPPROVAL FINALAPPROVALTHISPERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REOCESTED � <br />❑ OK FOR CA. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8887 FOR REINSPECTION • 24 hour noqce required <br />� <br />Inspector: ��1�v� Date:_ <br />EIR (4i09) <br />.rsruc+nro <br />