Laserfiche WebLink
OOMPLIANCE <br />flEQUIRED � <br />INSPECiION <br />APPROVED <br />I!'■ <br />IOIC <br />iu�u <br />IMPORTANT: Supply Intornnatlon in the sheded area by checking the appropriate clrcles. <br />Disregard topics that don't descrlGa your bullding or equlpment. DQ.M4I piace checks In <br />the two lett ootumns. <br />!", bY vertfcaAy 24'. -- - > -? <br />eztend undecthe enttrs stab <br />U! ba futl-deplh and locatad on the: - <br />I• <br />�; 24't:y : BUILpING ENVECOPE} <br />ked'�elow,'and oxtend from tfie top of the <br />ed space tcr a 2�'. ; <br />Q slab'9dge antl toundation wall. ; .:;:•. <br />, of the fallowing,fs checked. <br />si 300 Ft2 nf c[awl space. <br />WSEC Foundation phase requirements: <br />nspected by: Date <br />AII structural paneis such as plywood, oriented strand board, particle board, and wafer board shall be <br />Ia6ied "EXPOSURE I", "EXTERIOR", or"HUD-APPROVED". (VIAQ, S. 401.1) <br />Insulatlon baffles shall be placed in attfcs/ceilings to maintain at least 1" ventilation space and extend at <br />least 6" vertically above batts or 12" vertically above loosefill insulatfon (S. 502.1.4.5). <br />alai(n"g eH(clency reqiiired untlert�e salecied option stiap be {S. 502.1.5, s0z.7.2, Table 6-2):;, <br />�szU 70 (Up3ton Ij, ° x i1-65 {Options II; i� �s U.75 (OptioR !II } <br />�x U,eO iCptlon�' {�s U.50'(Option V!) 0`s U?5 {option Vii) , '' ` <br />SyITIb01S US2d: c equela > greater thrn � loss than = flrceter than orequel s/ess than orequaf <br />UPDATED SEPTEMBER 1991 <br />.Page2of6 <br />