<br /> December 1,2006
<br /> PF Development L.P.
<br /> 19401 -40th Avenue West, Suite 280
<br /> Lynnwood, Wazhingtan 98036
<br /> Attention: Richard Craiger
<br /> Subject: Summary Lettcr --��
<br /> Geotechnical Construction Observation-Building Nos. 10 and 12 t ugh 15 /
<br /> The Millin6*ton at Merrill Crcek �'
<br /> Everett, Washington
<br /> Pile No. 7630-004-03
<br /> INTRODUCTION
<br /> This letter presents a summary of our geotechnical construction obscrvation services for Building Nos. 10
<br /> and 12 through 15 of The Millingron at Merrill Creek located in Everett, Washington. Wc have provided
<br /> geotechnical construction observation services for the entire project but only the construction
<br /> observations completed for[3uilding Nos. 10 and 12 through I S located within Pod 2 are presented in this
<br /> Icner. We prcviously provided four summary Ieiters,the first dated luly 12,2006 for Building Nos.2 and
<br /> 19, the second dated July 21, 2006 for buildings 3 and 4, the third dated August 30, 2006 for Building
<br /> Nos. I, 5 and 6 and the fourth dated October 26, 2006 for Building Nos 7, 8, 9 and 1 I. We will provide
<br /> separate leners that will summarize our construction observations completed for the other buildings and
<br /> areas ofthe project.
<br /> The gcotechnical aspects usociated with construction of Building Nos. 10 and 12 through 15 included
<br /> soil bearing verification and swctural fill material characteristics, placement and compaction verification.
<br /> SUMMARY
<br /> Based on our observations, it is our opinion that the construction activities at Building Nos. 10, 12
<br /> through I S observcd by GeoF,ngineers were completed in general accordance with our recommendations,
<br /> and the project plans and specifications.
<br /> OBSERVATIONS
<br /> We visited the site on a full time basis on 7 occasions between July i9, and July 28, 2005 (rcfer to field
<br /> raport Nos. 24 through 31) during the mass grading period and completed 1 site visit on August 3, 2006
<br /> (refer to field report No. 35) to evaluate compaction of the fill placed within the Pod 2 area wherc
<br /> E3uilding No. 10 and 15 are located. Duilding Nos. 12 throu,gh 14 arc located in a cut area within Pod 2.
<br /> We completed intermittent site visits on 12 occasions between September 6, 2005 and �fay 10, 2006
<br /> (refer to tield report Nos. 57, 58, G7, 76, 112, 114, I 15, 125, 126, 136, 139 and 140) to evaluate the
<br /> footing subgrade soils within Building Nos. 10 and 12 through 15. E3ackfill placed to support the upper
<br /> tier of building slab was cvaluated on 13 occasions between November I8,2005 and April 27,2006(refer
<br /> [o field reporl Nos. 93 through 97, 101, 102, 127, 129, 130, 132, 133, and 137). A complete set of field