My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1401 MERRILL CREEK PKY #4 2016-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1401
>
1401 MERRILL CREEK PKY #4 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2017 4:00:02 PM
Creation date
2/26/2017 7:33:14 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1401
Unit
#4
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fF Dcvclopmcnt LP <br /> . July 21,200G <br /> Pagc 2 <br /> FILL MATERIAL EVALUATION APIO REQU�RED COMPACTION <br /> On-sitc soils �vcre used as fill and backfll at the site. We cvaluatcd fill placemcnt activities within the <br /> Pod 1 arca whcrc Building Nos. 3 and 4 arc located during thc mass grading period on 25 occasions <br /> bch+•cen Junc 23 and July 20,2005 (refcr to ficld report Nos. 1 thmugh 25). <br /> Wc cvalualed lhc fill coil by pcdom�in�; laborarory tcsting that genc�ally consistcd of ma�:imum drv <br /> dcnsily (MDD)cvaluations per ASTM D1557 testing proccdurc. Thc fill used within the (loor slab arca, <br /> gcncrally consislcd of d�c on silc glacial lill and advancc outwash soils. <br /> Wc cvoluatt� thc compaction of f 11 by obscrving plecemenl proccdures, by performing in-place density <br /> tests and by p�obing wilh a %n-inch diametcr probc rod. Fill was generally compacted to at Ieast 95 <br /> �x:rccnt o�thc �4:7D in arcas bcncath Duilding Nos.3 and 4 during thc mnss grnding period. <br /> Bascd on our obscrvations and cvaluations, it is our opinion that thc fill pinced within thc footprint of <br /> Building Nos. 3 and 4 during the mass grading period wcre compnctcd in general accordancc with our <br /> rccommcndations and lhc projcct plans and specifications. <br /> SOIL BEARING VERIFICATION <br /> Wc cvalualcd thc footing and slab subgradc soils at Building Nos. 3 and 4 and vcrificd soil bcaring on 8 <br /> a:casions bchrccn Aogust 4 and Septembcr 2G, 2005 (refer to ficld repor! Nos. 36, 39, 42, fi7 Ihrough <br /> 71). Loosc soil� whcn cncountcrcd at footing and slab subgradc clevation al Building Nos. 3 and 4 wcrc <br /> ovcr-cxcovatcd and repinccd with swctural fill compactcd to at Icast 95 perccnt of MDD. <br /> Bascd on our obscrvations, it is our opinion that soil bcaring pressurc of 2,500 psf was achicvcd in Ihc <br /> footing subgradc of Building Nos. 3 and 4 and thc slab subgradc was prcparcd .�gcncral accorclnncc with <br /> our rccommcndnlions and thc projcct plans and spccifications. <br /> MSE WALL CONSTRUCTION <br /> Wc obscrvcd construction of thc MSE�vall S7 along thc north and cast side of Building No. 4 and along <br /> portion of thc cast sidc of Auilding No. 3 on 5 occasions betwcen July 19 and July 28,2(HIS (rcfcr to ficld <br /> rcport Nos. 24, 25, 2R through 31). Wc also cvaluatcd thc compaction of fill within thc rcinforccd zonc <br /> bcl�ind thc MSE wall S7 by obscrving placcmcnt proccdures, by performing in-placc dcnsity tcsls and by <br /> probing wilh a '/:-inch diamctcr probc rod. <br /> f3ascd on our obscrvalions and cvalualions, il is our opinion that thc MSE wall S7 was consWcted in <br /> gcncrnl accordancc��•ilh onr rccommcndations and thc projcct plans and specifications. <br /> �% <br /> b i!e ACx Y.i0-004.03 <br /> GEOENGINEERS� <br />
The URL can be used to link to this page
Your browser does not support the video tag.