My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 MERRILL CREEK PKY 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1920
>
1920 MERRILL CREEK PKY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2018 1:32:55 PM
Creation date
2/26/2017 7:34:17 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1920
Notes
& 1930
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'-• --'•-"••"a I\7RACORP <br /> ++- SEAaA1' �['0: <br /> •Y•, L!� <br /> FACTORY MUTU � <br /> A L j � Actory Mutu�l Enjineetint Associuinr <br /> � � ��^'E�th Strect <br /> April 7, 1997 �� suue�Op <br /> � 1� P.O.Box 960'7 <br /> a�VF"! Bell��ve. Wzy�inEton 98U1y-gG77 <br /> . Telcphune(t0�)qsi-;931 <br /> Kr• �ill Foster, Project Nanager Fut�o��F3��2�9g <br /> Intracorp <br /> Fax (206) 349-2276 <br /> Re: Fire Pump Test <br /> INTRACORP ^Seavay Ceater� <br /> Lverett, VA • <br /> Index 78688.62 <br /> Account 23-19362 <br /> Desr Bill, <br /> This letter vi12 provide documentaeion regarding the reeenc fire p�p <br /> testing I conducted vith Nr, Pete Marhinney, Field Saperintendent vitA <br /> Smi[h Fire Systems. As detailed belov there are several items vhich vill <br /> need to be completed prior to our acceptance of the pump installation. <br /> The fire pump vas flow tested through a 3 1/2 in, test header ae various <br /> flovs ehroughout it•s range, end vas also sub�eeted to a seziee c+f <br /> automatic and manual starts, Ihe ptuop snd it's cor.troller w�re found to <br /> operate vell throughout it's operating range, up to a maximun Flov of 2,SGU <br /> gallons per minute. <br /> � Though the punp itself opezated vell, there is a concern :egarding the <br /> \ in�oming vater supply to the site. A :ire hydrant test vas also conduc:ed <br /> ) on the day of the purp teat. The hydrant next to the pumphouse vas floved <br /> � vi�h pressure taken from a hydrant at the soatheast corner of Buildinb g, <br /> The test results are 45 psi static, reducinQ to 25 psi at a flov of 1,33G <br /> SPm• T'his ia aignificantly different that the resulta of Che test <br /> conducted at the site by Smith Fire Systems on Decenber 18, ]996. The <br /> results of the December test vere static_pressur�5a psi_cedt�cing co 30 psi <br /> _— at a flov of-2;>24 gpm, The settzng of the pzessure reducins valve'i's-- <br /> likely the reeson Zot Lhe ditfezence. <br /> Please provide a responee to us regarding the folloving recorm�endations. <br /> 1• The preasure rediacing valve on one of the tvo incoming lead-ins Co the <br /> site should prefetably be renoved. 1 do not have a detailed understanding <br /> of the vater suppl}• to this site, but believe that a pressure reducing <br /> valve at this particular site is unnecessary, and is adversely affecting <br /> the vater supply to this site. <br /> If the pressure reducir,g valve Rust stay, then the setting on the valve <br /> sAould be changed such that th= vater supply at the site is ae it vas <br /> during Che December 1996 test. The concern vith the present setting is <br /> that the ineoning vater pressure d:ops belo� 20 psi vhen the fire pump is <br /> operating at it's higher Elevs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.