My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1920 MERRILL CREEK PKY 2018-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1920
>
1920 MERRILL CREEK PKY 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2018 1:32:55 PM
Creation date
2/26/2017 7:34:17 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1920
Notes
& 1930
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> r =11 I S T EHANNON �,��nn.,E�so�vs��Ncs �N��o�°�� <br /> SAINi IOWS <br /> DOSTON <br /> IJune 28, 1994 +�4 <br /> I <br /> i <br /> Sierra ConsWction Company, Inc. <br /> 16714 N.E. 79th Strcet <br /> i Redmond, Washington 98052-4425 !I <br /> Attn: Mc George Constantine + <br /> � RE: GEOTECIiNICAL REPORT, INTRAWEST SEAWAY, I <br /> I EVERETT, WASAINGTON <br /> Enclosed are four copies of our geotechnical report for the Intrawest Seaway project. This <br /> f report supersedes our March 18, 1994, dnft report and March 16, 1994, letter which was � <br /> � used for the SEPA submittal. The enclosed report incorporates minor changes made as a <br /> result of the review of the draft report by the design team. Hawever, since the comple6on <br /> Iof the dtaft report, there have been numerous changes in the site layout and planned I <br /> development, which are not reflected in this report. Although we have reviewed the � <br /> Iproposed plans for the project (as addressed under separate cwer) and they appear to have <br /> incorpo�ated our geotechnical recommendations, it will be critical that we monitor <br /> L construcGon to verify our conclusions a��d recommendations considering the changes that � <br /> have bcen made since the draft report. � <br /> '_ It has been a pleasure working with the design team on this project. Please call if you have <br /> any questions. <br /> I_ Sincerely, <br /> SHANNON & WIISON, INC. � <br /> I- � <br /> � � � <br /> Gregory , cher, P.E. I <br /> IPrincipal Engineer <br /> MS:GRF:WPG/lkd � <br /> IEnclosures: Geotechnical Report (4 copies) <br /> IW6693-01.LT2/W6693-Ikd/dgw <br /> 400 NORTH 34TH STREET•SUITE 100 <br /> I PO BOX300303 W-6693-01 <br /> SEATTLE.WASHINGTON 98103 � <br /> 206•632•0020 FAX20fi•633•67�i <br />
The URL can be used to link to this page
Your browser does not support the video tag.