My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 E MARINE VIEW DR SITE WORK AND UTILITIES 2018-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
1001
>
SITE WORK AND UTILITIES
>
1001 E MARINE VIEW DR SITE WORK AND UTILITIES 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 7:52:49 AM
Creation date
2/26/2017 8:05:47 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1001
Tenant Name
SITE WORK AND UTILITIES
Notes
VINTAGE APARTMENTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � PUBLICWORKSDEPARTMENT <br /> UH1iNes Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> P.eceipt # Date Paid �(% ' ,�_ <br /> Costof Work Order 4Vork Order# <br /> ✓ Cost of Service Order — 354.00 Service Order � SU ��� �� <br /> Contact Person Bob Gcrtz Telephone � 360-815-71�12 <br /> Requested By Paul McKee Date of Request 10-1-04 <br /> Property Owner(name) Exxel Pacific _ <br /> Charge Cost to (name if different lhan o�vnerj <br /> Address 323 Telegraph Rd City Bellingham Zip 98226 <br /> Installation Location 1001 E Marine View D� <br /> [nscallaiion type/description/size/el- #6 —4" domestic service. Install 4" Neptune meter, streiner, <br /> test spool and 1" bypass in developer supplied, installed and piped through vault. Vault to be <br /> Utilities #675 WA with a 675-TL-2-332P lid. Meter lay length is 65". <br /> ❑ The followulg estimate is Uased upon the Utilities i_'ivision providing alllabor, equipment. <br /> materials,rnstoration, and final hook-up. <br /> Please nofif�he Citv uf Gverett Utilities Division 10�vorkinr, days in advancc of renuired installatio_n <br /> date to allow for schedulin�:and v�rts procurement <br /> 4Vhenever the eslimated cost is nol sufficient to cover the total espense for labor, material, equipment rental and <br /> administralive costs, the deficit shall Ue charged to the property� for which such installation was made and the <br /> o�vner thereoP, and provided further, that any escess payment shall Ue returned to the person applying Eor the <br /> installation. <br /> *Deposit must Ue paid prior to ordering parts or scheduling work. <br /> WATER t�tETERS 3"AND LAR GER NfAY I��1 VE A SI,Y TO 10 WEEK LEAD TL1�IE. <br /> cc Bldg. Permit Center <br /> btaterial 228.00 Mark Sadler <br /> Kirk Brooks <br /> Labor and Benefits 70.00 Gordon lVitcher <br /> Lquipment Rental 50.00 RoUert Waddle <br /> �latt�Velborn <br /> Ta� 6.00 Pauf S1cKee <br /> TOT:�L 354.00 Gem�Crum <br /> /�Prepared by: Gerr Crum / "��e Lstimate Prepared 10-1-04 <br /> .-�ccepted b��: ` G � Representing <br /> LSTI11:\TG GOOD FOR 6 �tONTHS � <br /> _ .�..��:...... ......._.,�i..����_,n:c�,�: �oI� �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.