My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 E MARINE VIEW DR SITE WORK AND UTILITIES 2018-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
1001
>
SITE WORK AND UTILITIES
>
1001 E MARINE VIEW DR SITE WORK AND UTILITIES 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2018 7:52:49 AM
Creation date
2/26/2017 8:05:47 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1001
Tenant Name
SITE WORK AND UTILITIES
Notes
VINTAGE APARTMENTS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PU6LIC WORKS D[PARTMEM <br /> � UHIiHes Division,3200 Cedar Sheet <br /> Everett WA 98201 <br /> 425-257-8800 <br /> Itemipt N Date Paid <br /> Cost of Work Ordcr Work Order# <br /> d Cost o(Srrvitc Ordcr 7,335.00 Sc�rvicc Order N <br /> Contact Person 13ob Gertz "Pelephonc k 360$15-7142 <br /> Itequcsted T3y Paul McKce Datc of Request 10-1-04 <br /> Property Otvncr(name) Exxel PBCIfic <br /> Ch�r�;c Cost to(name if diffcrent than owner) <br /> nddress 323 Telegraph Rd City Bellingham 7ip 98226 <br /> InsWllation Location 1001 E Ma�ine Vi6W Dr <br /> Installation type/description/size/etc #5—4" domestic service. Install 4" Neptune meter, strainer, <br /> test spool and 1" bypass in developer supplied installed and piped through vault. Vault to be <br /> Utilities #675 WA with a 675-TL-2-332P lid Meter lay length is 65". <br /> ❑ The following estimate is Uased upon the Utilities Division providing all laUor,ec�uipment, <br /> materials, restoraHon,and final hook-up. <br /> Plc�sc notify the Citv of�vcrett Utilities Division 10 workin� days in advance of required installation <br /> dite to ailo�v for scheduline and parts procurement <br /> Whenever the estimaled wsl is not sufficicnt lo cover the lotal expense for IaUor,material,equipment rental and <br /> administrative cosls, the deficit shall Ue chuged to the property for which such installafion was made and the <br /> owncr thereof, and provided further, lhat any excess payment shall bc rcturned to the person applying for the <br /> installation. <br /> *Deposit must bc paid prior to ordcring parts or scheduling work. <br /> WATGR METCRS 3"AND L.ARGER MAY HA VE A SIX TO 10 WEEK LEAD TIME. <br /> cc: 131dg. Permit Center <br /> �4atcri,�l 4,185.00 Mark Sadlcr <br /> Kirk Brool:s <br /> I.abor and l3cnc�its 2,508.00 Gordon Witcher <br /> Lquipmcnt Kcnlal 516.00 Robert�Naddle <br /> �fatt Wclborn <br /> '�;�� 126.00 Paul �9cKee <br /> '1'O'1':U. <br /> 7,335.00 Gcrq�Crum <br /> Prcpared h�: Gerry Crum ��� -1-� llatc 8stimatc Prcpared 10-1-04 <br /> Acccptcd b�: Rcprescnting <br /> ESTINATF. COOD FOR 6 D10NTHS <br /> . ���,..,,. .,.�..��..,i��..�..�r,..ir,�a:nor 5 of_�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.