Laserfiche WebLink
Ltr. C. Morgan (BOd06-006) <br /> Octobcr 7, 200-1 <br /> Pa�c 2 <br /> Area Separation Walls (r�S�1') <br /> 7 & 1S Roof protection. The �otes on Sheets A3.G � A3.7 (and associated other sheets) should <br /> bc coordinated to sho�v that thc l0 fect of `no openino area' is provided at the lower roof area <br /> (occupied roof top levels). It is not necessary to restrict openings in the upper roof an additional <br /> 5 feet on the adjacent side of the wall. <br /> Construction <br /> 4. The one-hour bcam protcction assembly as shown on 3hcet A0.4 should be rcvised Crom GA <br /> Fi]e No. BM 113� to l 137. <br /> 18. Thc roof finish schedule on Sheet A0.7 should reflect the minimum 5" floor-co��in� <br /> requirement for public toilet rooms as nnted on Sheet A(.3 <br /> ��itink <br /> 13. All egress dours ser�ing the �ssetnbiy cccupanc;es ,hculd be shown with panic hnrdware <br /> on the door schedule. Tnis includes doors intoithrough stair enclusures required for egress frcm <br /> thosc spaces. <br /> l3. The stninvays and comdors that scr�e occupant loads of 100 or more persons should be <br /> shown with emergency egress lighting. <br /> Please prepare a response letter showing wherc each item in this correction letter is addressed on <br /> dic plan set. <br /> Upon resubmission of the drawings, your application ��ill be given priority and plan revic��� will <br /> recommence. <br /> All required submivals shall be of sufficient detaii and contain sufficient information to ensure <br /> that the proposed strucwre ���ill be construcred in compliance with all adopted codes. <br /> Sin�er��y, <br /> � <br /> � <br /> To . Lee <br /> Plans Examincr <br /> �� <br />