My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
121 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
121
>
121 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 9:23:03 AM
Creation date
2/26/2017 9:22:38 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
121
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> BLACK & VEATCH <br /> 720 Third Avenue Suile 1100 Seattle,WA 98104 (206)682-1133 Faz 621-8782 <br /> City of Everett B&V Project 63242.122 <br /> Everett Delta Power Project B&V File 63242.70 <br /> August 23, 1999 <br /> Mr. Kirk Brooks <br /> Public Works <br /> 3200 Cedar Street <br /> Everett, WA 98390 <br /> Subject: Public Works Perrnit <br /> Dear Mr. Brooks: <br /> This memo transmits the additional information you requested as part of our <br /> application for a Public Works Permit. <br /> Ariached, please find the following items: <br /> 1. One (1) copy of Revision B of the Erosion Control Plan. <br /> 2. One (1) copy of NPDES Permit. <br /> 3. One (1) copy of SWPPP dated August 1999 for Stormwater Discharge <br /> Associated with Construction. <br /> 4. One (1) copy of SWPP dated September 1998 for Pre-Construction <br /> Conditions. <br /> The Erosion Control Plan was r�vised to include references to City of Everett <br /> standard details 205A ans 213, as well as the City of Everett General Notes. <br /> Also, the following estima:2d quanities apply to the work associated with the <br /> Demolition and Site Preparation work. <br /> Estimated Quantity <br /> Material to be Removed Off-Site <br /> Unsuitable (wood chips) 1,500 Cubic Yards <br /> Milled Asphalt Pavement 2,300 Cubic Yards <br /> Material to Imported to Site <br /> Gravel Borrow (Structural Fill) 8,300 Cubic Yards <br />
The URL can be used to link to this page
Your browser does not support the video tag.