Laserfiche WebLink
1 <br /> introduction <br /> 'Ibe Ecology stormwatcr pollution control propam is based, in part, on tLe fcdctal regularions oC 40 <br /> CFR Parts 122, 123, and 124 Subchaptcr D (Water Programs) issurd oa November 16, 1990, and the <br /> implcmentacion of scccion 402(p)o!the Fedenl Clean Water Act. TLc goals of thcse fcdcral <br /> regulaaoas arc to rcduce or eliminace normwater polluuoa from w¢mu_tion activiry by requiring the <br /> implementation of�echnology based Stormwater Pallution Prc�• auon Plans (SWPPP), and to eliminate <br /> surfaa w•a�er qualiry s�anduds violadons caused by scorma•a�er. <br /> Under the awhoriry of Chap�cr 90.48 RCW, Ecology has ezpanded the scope of iu swrma•atcr prop�am <br /> bayond ihe tedeca! govemment's goaLs. Ecology's program requira wmpliana aith ground a�a[er <br /> qualiry and scdiment managcmrnt standards fot [hosc operatioac that�arc required to obtain an NpDES <br /> permit for a scorma•arer dixharge w swiacc a•azers or �wrm draint. <br /> To comply aith 40 CFFi Paru 122, 123, and 124, and pucswwt �chc provisions of Chaptus 90.48 and <br /> 90.52 RCW and Chapter 173-226 WAC, all those aho file � Norice of Intrnt and are cnveted under this <br /> bauline gencral permic (xc Special Condition 52) shall comply aith the followitig: <br /> Special Conditions <br /> S1. $chedule of Comoliance <br /> A. Notice of Intent(NOq Subm�ssion L)eadline <br /> The permit application called a Nova of]mm�t (NOn shall be submiaed to Ecology on or <br /> be(ott ihe date of the fvst public noti« and at least 38 days prior to the statt of � <br /> coaswction acvvitiu. (stt NOI mswcrioas in Appendiz 1) <br /> B. Public Nodce Rtq�wement <br /> Ac [he time of application t6c permiaa must publish a noace that thry aze saking coveragc <br /> tmder Etology's general stormwatet permit for consvuction acavities. Thic norice must be <br /> published at leut once wrb wecr for two wasecutive wals, m a single newspaper which <br /> haz general cimilation m the ca�mty in ahich the coacwction is to t�lce plue. Refer tn the <br /> N01 iaswctioat for public mrice language crquireme�. S[ate law requirrs a 30 dav <br /> public commrnt period prior�n permit caverage, thereforc permit covcragc will mt be <br /> ganted sooner tLan 31�y5 afur the daze of the lzsc public notia. <br /> C. Smrmwater Pot]udon Preveation Plan (SWPPP) Deadtina <br /> Pcrmit covcrage will not be granted �mti] [b� permiaa haz mdicatcd complecion ot the <br /> SNPPP or ccrtified that developmeat of a SWPPP in accordance with S9 of thic pe:mit w�ll <br /> occur prior to the commrncemcnt of the coastrucuon attiviry. SWPPPs are not submined <br /> tn Ecology bat retaincd on-site or wiihin rcawaable access to the sim to be made available <br /> to Fcalogy and local govcrnmmt�! agencia upon request. <br /> D. Swe Environmcnca! Poliry Aa (SEPA) Nocification <br /> The permiuee must comply with the SEPA pra�cs and provide thc following infarmatiou <br /> prior to rereiving permit coveragr. the type of SEPA documeat requircQ, the date and <br /> agenry ahich istued Ihe final determiaavon and whethu or not the permitttt is awarc of <br /> any appeals of the adequacy of thc SEPA d�cumeat. If the abovc informatian is not <br /> supplied on thc NOl it mucc be sUpplied in writing to Ecology prior to permit coverage. <br /> 6 <br />