Laserfiche WebLink
i <br /> . , <br /> iv) St�biliution adequa�e w prevent erosion ot ouileu and adjacent saeam <br /> � banla s2�all be provided az the ousJets of all conveyana syste�s. <br /> v) All aorm drain inle�s made operable durmg consauction shall bc properly <br /> mainuined. <br /> vi) Whcrc ever wnsuuction vehide access rowes inursecc pavcd roada, <br /> provisionc mus[be made to mt^��^;'^ the a�aacpon of udimeat (mud) onto <br /> the paved road. lf sedimrnt is traasputted onto a raad surface. the roads <br /> adjacmt a thc coaswction site shall bc c�eaned on a regular buis. Sveet <br /> . . a�azhingshall bcallowcd ontyahtrotha mctbods to pmrnt thc nam�wn <br /> OC f0 C[IDOVt Ib[ SGQIIDt�LS 27G 1m�ttrrrccft�l, <br /> b. Swcnaal Pnctices: <br /> ����tn�ta��iupon practias, the Frosion and Scdiment Conuol Plan <br /> shall mcludc a drscription of swcam! BMPs to diven iloas from ezposed <br /> soils, store tlows. m otherwise limic nmoff and the discharge ot pollutanu from <br /> expcued ueas of the site m the degree anainable. Sl�prectica may include <br /> silt fenas, eazth d�lces. dr+ma8e swaltx. sedimem traps, check dams. <br /> r,N��-`,-e dreins. Pipe slope drsias, level speradas. swrm ,irain inlet <br /> ; ..: .aos sxk ouilet pcomctian. ttinforced wil ntamin8 SYsums. gabioas, <br /> :�;.:�Xu:��.nt basias. Saucnval prectias sLould be pla�ed on upland soils to <br /> the degra aaainable. 1be mstallarion ot thrse dcvica may be subject to <br /> Sectian 404 of the Federal Clnn Watcr Act. 'Ibe plan shall ensute that the <br /> follawing requiremenu are sausfied: <br /> i) Prior m Iavmg che sitc, sta[mwata nmoff sha11 pass through a sedimeac <br /> pond or sediment vap, or other appropriate BNIPs• <br /> il) Propestia adjaceat to t6e projxt site shill be protcctcd from scdimeat <br /> deposinan. <br /> iL� Sedimmt ponds and tr�s. Paimemr d�lca. sediment barriers, and athu <br /> HMPs mtended m mp udimcat ou-site shall be coacwcted as a firn scep <br /> m Bading. Theu BMPs ahall be fimctioaa]before land dimutiing <br /> uvviria uke pl�ce. Farthen suu�wres used for sedimem convol such az <br /> damt, d�ca. and diversioas s6all be stab�l'ned as soon u possble. <br /> iv) ProPertict aad a•aterways dowataram from tbe wnsvuction siu shall bc <br /> prvtcaui from erosion due to mc�xs in volume, velociry, and pcak 11ow <br /> of normwater nmotT from t6e project sitc. <br /> v) All temporary crosion and u.dimcnt convol BMPS shall be removcd within <br /> 30days aftcrfinal sitrstab�liration is achicved or afur the tcmP��Y <br /> BMPs are no langer necded. Trapped scdimenc sha11 b� nmoved ot <br /> subaized on-site. Dismrbed soil arcas resWtmg from removal shall be <br /> per�_�dy stabiliud. <br /> 13 I <br />