Laserfiche WebLink
� Application for General Permit to <br /> � Discharge Stormwater Associated with � Change of Infortnation <br /> ,,,,,,,,,, ,,,,, Construction Activity <br /> E�C�O�L�O�G �Y (Notice oi Intentl Pertnit A' S03 - <br /> IPiease print in ink or type) Please Fiead N01 Instructions Before Flling Out This Form <br /> I. Contact Person II. Owner/Representative of Site <br /> IAII correspondence will be mailed here) <br /> Contact Name Phone No. Owners Name Phonc No. <br /> Company ComDany Name <br /> Madmg Address Mailing Address <br /> City Statt Zip + 4 City State Zip + 4 <br /> III. Site Location/Address IV. Billin Address <br /> Site Name Contaa Name Phone No. <br /> S[reet Address (or Locauon Description) Company Name <br /> Gty lor nearest cttyl Zip + 4 Mailing AGdress <br /> County City State Zip + 4 <br /> Provide legal description if no address tor site lattach separate sheet if necessary) <br /> V. Receivin Water Information Icheck all chac applyl <br /> A. Does your construttion site discharge stortnwater to: <br /> 1. 0 Storm drain system - Owner of stortn drain system (name) <br /> 2. O Indirectly or directly to surface waters Ie.g., river, lake, creek, estuary, ocean, wetland) <br /> 3. ❑ Directly to ground waters of Washington state. ❑ Dry Well ❑ Dreinfield ❑ Other <br /> B. Namels) of receiving water�s) • <br /> Initial discharge is to an unnamed receiving water? ❑ Yes ❑ No <br /> VI. Construction Activit Information <br /> 1. Total area to be disturbed Acres <br /> 2. Projected consuuction.startup / ; projected completion date / <br /> month year month Yeer <br /> VII. Stormwater Polfution Prevention Plan (SWPPP) <br /> Hz� a stormwater pollution prevention plan, been developed? ❑ Yes ❑ No <br /> If N0, will a plan 6e developed prior to the start of consttuction? ❑ Yes ❑ No <br /> Ecology must be notified that a SWPPP will be developed prior to the start of conmuction by checking the <br /> I appropriate boxes above or by sending a follow-up letter to Ecology. <br /> A stormwater pallution preverttion plan must be develaped prior to tfie start of construetion. <br /> ECY 020-85 (Rev. 11l951 /Conunued on Back Page/ (Appendix 1) <br />