Laserfiche WebLink
' . - Instructions for Completing the Notice of Termination Form <br /> ' For the Baseline General Permh to Discharge Storm Water Associated with <br /> Construction Activity <br /> This is an instruction document for preparing a Notice of Termination (NOT) for coverage under the Baselin� <br /> General Permit for the discharge of scormwater associated v�ith conrnuction activity. Where all stormwater <br /> discharges from a construction site have been eliminated and the site has undergone final scabilization, the <br /> pemi�:tee of the site shall submit a Notice oi Termination to the Department o1 Ecology. The permit fees will <br /> continue until this notice is received by Ecology. <br /> Instructions tor Completing the Notice of Termination Form <br /> Please complefe the document by prinling or ryping the in/onnatinn in ink. <br /> 1. Permit Number Fost the permit number shown in the upper right hand corner of your <br /> permit on this NOT. <br /> 2. Contact Person ISection 1.1 Give the name, address, and telephone number of the person who is <br /> available 24 hours a day for contact by Ecology or other locel <br /> auihorities. The contact person should be someone who is completely <br /> familiar with the site, and charged with overseeing compliance with <br /> the permh requirements. <br /> 3, OwnerlRepresentative of Site Give the name, and the address of the person, company, firm, public <br /> (Section II.1 corporation, rnunicipality or any other entity which owns or legally <br /> represents the site. lt the owner is the same as the contact oerson. <br /> enter 'same as contaci' on the first line. <br /> 4. Site Address ISection III.) Enter the street address or location description, including the city or <br /> nearest crty and counry for the construction site. Conscruction site <br /> which do not have a stteet address must also provide a legal <br /> description in the space provided or as an attachment. <br /> 5. Billing Address ISection IV.) I�dicate where the final fee invoice sfiould be sent. <br /> 6. Construction Activity Indicate that all stormwriter discharges associaced with conscruc[ion <br /> (Section V.1 activity have been eliminated, and final stahilization of all e�cposed soiis <br /> through vegetation or other measures has been completed. <br /> 7. Certification ot Permitteelsl This statement should be read carefully by the permittee(s). The <br /> responsible o�ciai or authorized representative of the owner shall princ <br /> tfieir names for claritY, then sign and date the docurnent on the lines <br /> provided. Refer to General Condition G20 in the permit for signatory <br /> requirements. <br /> Address to Submit the NOT <br /> Notices of Termination are to be sent, using the Construction Activity NOT form included in the permit as <br /> Appendix 2, to the following address: <br /> Department of Ecology <br /> Industrial Storm Water Unit <br /> P.O. Box 47695 <br /> Olympia, WA 98504-7696 <br /> Questions <br /> Questions conceming proper completion of this form can be directed to the Department of Ecology by calling <br /> (3601 407-6437 eF-49�-643fr. <br />