Laserfiche WebLink
STGIL�I�VATER POLLUTION PREVENTIO`l PLAN <br /> FLORIDA POWER R LiGHT CO\IPAN�' <br /> F.VERF.TT DEL"I'A POWER PLAtiT <br /> 1.0 IhTRODUCTION <br /> This Stortm�'�tcr Pollution Prcecntion Plan (SWPPP) has bccn preparcd for Florida Powcr and Light <br /> Company (FPL), and is intcnded to cover demoliuon acUvities and b�ading of Lot 1 at the 1Veyerhacuscr <br /> �Vest tifill srte m Gvcrctt. �Vashmgton (see sRe maps in Appendi� A). The plan has bcen prepared to <br /> mect thc conditions of thc existing Notional Pollutant Discharge Eiimmation Systcm and Statc �Yastc <br /> Discharge Gentral Permit Cor Stormwater Discharges Associated with Cnnstruction Activities issued <br /> for the site under Permrt Number S03-OU3271, dated luly 31, 1995. <br /> Demohnon of existing onsite structures and grading oCthe srte is rcquired to facilitatc future conswction <br /> of the Everett Delta Po«'er Plam. Currently, the sitc consists of inechanical buildiugs, yard piping, <br /> equipmcnt, and structure foundations t}�ically associated wrth paper produc;ion. The Contractor's scope <br /> of work is pro��ided in the pro�ect bid documents cntitled "Everett Dcita Po«'cr Project, Site Demolition <br /> and Prcpar�tion. Bid Packagc Submittal, July 1999". Approximatcly 52 acres of thc sitc, 0? acres <br /> abo�•e the \'PDES permtt threshold. ��'ill be du�urbed by' the demofition and grading activ�ucs. 'Ihc <br /> ob�cctiecs of this plan Collow: <br /> • Implement Bcst titan�gemcnt Pracuccs for idcnufying, reducing, elimmaung, or preventing <br /> onsite erosion and sedimcntation and oftsitc dischargc oCscdiments and pollutants. <br /> • Prccent ciolations of surCacc and Ground watcr quality and scdimcnt managcmcnt standards. <br /> • Prevent impacts to receivine waters from peak rates and volumes of storm�vatcr runoff. <br /> • Provide a Spill Prcvention and Emergency Cleanup Plan (or identifying, reducing, <br /> climinating, or prcventing discharge of hartnful, rcculated, or hazardous substanccs into <br /> surface and ground�vatcrs. <br /> The demolitian and grading acuvitics covered under this SNPPP are intended (or activities on Lot 1 <br /> only, as rcquircd to prcparc thc sitc for construction of thc proposed plant. Indusmal and stortnw�atcr <br /> dischargcs associatcd wrth construction and opention of the proposed plant are not addresscd by this <br /> plan. Tliis plan details management practices, and is intended to mect Icdcral, statc and local regulatory <br /> rcquircmcnts. <br /> Thc Contracror shall maintain a copy of this plan onsitc or wnhin rcasonablc acccss to thc sitc, anJ rt <br /> shall Uc madc availabh to Ihe Drpartmrnt of Ecology and local govcrnmcnt agcncics upon rcyucst. <br /> "Chc Contractor shall dcsignatc a contact person to bc a��ailablc 24 hours per day to respond to inquiries <br /> or dircctivcs from thc Dcpartmcnt of[cology. <br /> Florida PoNer & Light Company F.�crctt Dclta Power Plant <br /> SWPPP — Revision i Au�ust 1999 <br />