My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
121 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
121
>
121 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 9:23:03 AM
Creation date
2/26/2017 9:22:38 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
121
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for cleanup of existing contaminated soils under this pian. Florida Power & Liglu shall implement a <br /> cleanup plan independent of Uiis contract. Contaminated soils can be identifieJ by unusual color, <br /> consistency and/or odor. <br /> 2.5 Sequence of Construction <br /> Erosion and sediment control measures shall be in place prior to the start o(demolition or earthwork. <br /> Areas shall be stabilized with permanene vegetation upon completion of die grading activities. �Vhen a <br /> healdiy stand of �egetation is establishcd, accumulated sediments and temporary sedimentaiion control <br /> deviccs shall be removed. Removed sediments shali lx dispascd of in a manner to prevent fur�her <br /> crosion and sedimentation. <br /> 3A D[AINTENAtiCE AND INSPECTION PROCEDUP.E <br /> Erosion and sediment control inspection and maintenance pr�cuces tu be implemented at thc site follo«: <br /> • Turbidity bamers shall be installed at all locations whcre thc possibility of transferting <br /> suspended solids into thc rcceivine water body exists. IIarriers shall be inspected and maintained <br /> in good ��rorking condition. <br /> • All control measures shall be inspectcd at Ieast once cach week and following any storm c��cnt of <br /> 0.5 inches or grcater. <br /> • rVl measums shall bc maintained in good working order; if a repair is necessaty, �t shall bc <br /> ini[iatcd ��ithin 24 hours of repon. <br /> • Duilt up sediment shall bc removed from silt fencing when it has rcachcd one-third the hc�eht of <br /> thc (ence. <br /> • Silt (ence shall be inspected (or depth of sediment, tears, and to ensure that Cabnc is securcly <br /> attachcd to thc fcncc posts, and fcncc posts�rc firmly in thc ground. <br /> • Catch basm inlet protection shall be inspected for escess sedimentation. <br /> • Temporary and permanent setding and planting shall be inspccted for bare spots, washouts, and <br /> hcalihy growth. <br /> • A maintcnancc inspccUon rcport shall bc GIeJ aflcr cach inspcction. <br /> • "I�he site superintendcnt shall sclect indrviduals, as necded, to bc responsible for inspections, <br /> maintensnce and repair acti��itics, and filing inspection and maintenancc rcport. <br /> • Personnel selected for inspection and maintenancc rcsponsibi6ties sl�all receive training Gom the <br /> Cunstruction �tanager. Training shall include inspection and maintenance practices necessary to <br /> cnsurc effecti�'c operation o(the onsite crosion and sediment control measures for the durauon of <br /> thc projrct. <br /> Florida Powcr & Light Company Evcrett Dcltn Powcr Plant <br /> SWPPP— Revision 1 Augast 1999 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.