Laserfiche WebLink
. Thc spill prevenuon plan shall be adjusted after a spiil to prcvent reoccurrence of the incident. <br /> Plan ad�ustmen� shall include a description of the spill, the caused, and amended cleanup <br /> proccJures. <br /> • Thc Construction �fanager responsible for day-to•day operations shall designatc a spill <br /> prcvcntion and cicanup coordinator. 'ihrcc additional site personnel shall reccivc spill prcvcntion <br /> and cicanup training. The names of responsible spill control personnel shall be posted in the <br /> matenal storage area and in the Contractor's onslte officc. <br /> � <br /> Florida Power & Light Compnny Everett Delta Power Plant <br /> SIVPPP— Revision 1 August 1999 <br /> l2 <br />