My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1229 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
1229
>
1229 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 9:26:51 AM
Creation date
2/26/2017 9:26:44 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1229
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ; <br /> i <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> , <br /> � Connecl side sewer per City Standard #'s 601, 602, 604. <br /> � Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration syslem per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size irench is 3.5'wide,2'deep and 25' long. See attachment for <br /> more details. <br /> / y�J The contractor musl meet with the Public Works Inspector lo discuss potential drainage rouling prior to <br /> �-- beginning the project. <br /> 10. Instalt erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales,or erosion blankets. <br /> 11. Install erosion controi measures per Cily of Everett Slandards for small parceis <br /> 12.J Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material irom foundation, sidewalk and driveways shall be hauled lo an approved, <br /> permitted sile. No wastinc� of malerial is allowed on this building lol. <br /> 14. No dirt, mud, rocks or debris lo be lracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedeslrian lravel. <br /> 1G. Adjust water meter box 1"above sidewalk grade. <br /> 17./ Remove and replace curb, gulter and sidewalk as per City of Everelt Standard Plan#'s 305A&306 on <br /> this proposal's fronlage as directed by lhe Pubtic Works Inspector(i.e. atl unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per Ciry of Everett Standard#307. <br /> 19. Pave driveway from the front properiy line oul to the streel paving. <br /> 20. Contact the _ Waler Districl for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per Ciry Standard Plan ikU2 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump syslem is to be instailed, the pressure line must discharge into a private manhole, then <br /> gravily(low acros:the public right-of-way. <br /> 23. A sprinkler system is required (or this biulding in compliance wilh the requirements of NFDA Standards <br /> 13D. <br /> PWComnxnis / `7� <br /> � .% <br />
The URL can be used to link to this page
Your browser does not support the video tag.