Laserfiche WebLink
( f <br /> PUBLIC WORKS PERMIT COMMENTS <br /> ,, qs per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �unnect side sewer per City Sfandard #'s 601, 602, 604. <br /> � 7.�Connect all rooftop downspouts to the side sewer. <br /> i <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per Ciry of Everett <br /> Stortn Manual 3-2.6.2. Width _, Depth_, Length _. <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan N's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 12. install a Type I concrete driveway per City of Everett Standard #307. <br /> 73. Pave driveway from the front property line out to the street paving. <br /> 14. Contact the _ Water District for connecting pro�:isions for this building's <br /> water and sewer services. <br /> 15. I:a sewer pump system is to be insta��ed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior ta beginning the project. <br /> 17. A sprinkler sysiam is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. _ <br /> 1� ALI, L-�Cs�V�.TC� r�-1 ��� �,�L i- ��� ;y� l=o�JtiDaT7e,� <br /> `. � C��c<.'/-�L�' , Ot�1 �•'e o�.u- 5 rnjLL i3 E H+�-L11,L.1� To f�.0 <br /> � � -�;�c p� /�1�11L�/.fL <br /> ,�rt��'wL',:�'�.J /�r.2.�?;r/z—�J -5i� /vo „u.l-s,—c J <br /> � � -{�t,�. r�vi�U�N�j �_�` . <br /> /� l r � �1��/�tl� l�l�t� .l��z <br /> ���ti <br />