My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1311 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
1311
>
1311 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 9:33:57 AM
Creation date
2/26/2017 9:33:50 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1311
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( f <br /> PUBLIC WORKS PERMIT COMMENTS <br /> ,, qs per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �unnect side sewer per City Sfandard #'s 601, 602, 604. <br /> � 7.�Connect all rooftop downspouts to the side sewer. <br /> i <br /> 8. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per Ciry of Everett <br /> Stortn Manual 3-2.6.2. Width _, Depth_, Length _. <br /> 10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan N's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 12. install a Type I concrete driveway per City of Everett Standard #307. <br /> 73. Pave driveway from the front property line out to the street paving. <br /> 14. Contact the _ Water District for connecting pro�:isions for this building's <br /> water and sewer services. <br /> 15. I:a sewer pump system is to be insta��ed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior ta beginning the project. <br /> 17. A sprinkler sysiam is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. _ <br /> 1� ALI, L-�Cs�V�.TC� r�-1 ��� �,�L i- ��� ;y� l=o�JtiDaT7e,� <br /> `. � C��c<.'/-�L�' , Ot�1 �•'e o�.u- 5 rnjLL i3 E H+�-L11,L.1� To f�.0 <br /> � � -�;�c p� /�1�11L�/.fL <br /> ,�rt��'wL',:�'�.J /�r.2.�?;r/z—�J -5i� /vo „u.l-s,—c J <br /> � � -{�t,�. r�vi�U�N�j �_�` . <br /> /� l r � �1��/�tl� l�l�t� .l��z <br /> ���ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.