Laserfiche WebLink
� __ <br /> T <br /> ., <br /> Splash Board and Truss Top Chord <br /> All Girts <br /> Figure 2. Faslencr Pattcrn for Splash Doard,Truss Top Chord,and Intermediate Girts. <br /> 6.1 Conswction Q-I <br /> In addition to the rcquirements of 6.0,thc gut spacing is 36 in.or less on�enter. <br /> 6.2 Conswction Q-2 <br /> In addi�ion to thc requiremcnts o(6.0,q 12 x 12�n.stitch xrews,hex hrad with neoprene washer,8 in.on- <br /> cen�er,are rcquired. Giru are 36 in.or Icss oncenter. <br /> 6.3 Construclion Q•3 <br /> In addi�ion to�hc rcquircment of 6.0,ri l2 x IR in.stitch screws,hex head with wazhers, 8 in.on-center, arc <br /> rcquircd. Insi�ll 2 x 4 blocking on the cnd-wall posts whcre the end-wall metal cladding ends(at sidewalls and door <br /> faces)and fasten stecl to blocking wiih H12 z 1 5/8in.scrcws(Dap Grip SPEX)8 in.on�center. Blocking lumber <br /> is from Group 111,11,or I(See App�ndix A). lnstall blocking with one 2(id thrcaded and hardened nail,each end,not <br /> Icss than 2 in.frorn block cnds. Giru arc 36 in.or]css on-ccnter. <br /> 6.4 Conswction Q� <br /> In addiiion to ihe requircmcnts of 6.0,26 gaugc Powerpanel is required with stitching 8 in.on-cenler,N12 x <br /> I/2 in.hcx head willi ncoprcne washcr. Install 2 x 4 blocking on thc end-wall posk wherc the cnd•wall metal cladding <br /> ends(a1 sidewalls ordoor faccs)and fasten slccl to blocking with N12 x I 5/8in.screws(Deep Grip SPEX)8 in.on- <br /> cemer. [ilocking lumlxr is(rom Group III, tf,or 1 (See Appendix A). Install blocking with ane 20d threaded and <br /> hardcncd nail,each cnd,not Icss�han 2 in. from block ends. Girts are 36 in.or tess oncenter. <br /> 6.5 Conswction Q-5 <br /> In addition to the reyuircmcnts of 6.0, 1/2 in.CDX plyw�ood is rcquired. Install 2 x 4 blocAing on the end- <br /> �� <br /> � <br /> �� <br />