My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1727 E MARINE VIEW DR 2018-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
1727
>
1727 E MARINE VIEW DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 8:59:40 AM
Creation date
2/26/2017 10:16:20 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1727
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Q <br /> �; <br /> INFORMATION FOR DEVELOPER: 'T , <br /> xt�"� J �,- <br /> Cj1 C>+1 <br /> +o x x 1 . Detailed drawings in accordance with City Design and Construction <br /> y y y Standards shall be submitted to the Public Works Department <br /> r x showing site parking layout, landscaping, utilities, storn i.rain- <br /> � �x� age, temporary construction erosion control, and all req�iired <br /> o y o improvements in the public right-of•-wav, public Works ! <br /> ,� H,� Department ap�roval of these drawings is required prior to any <br /> v,H permits being issued. All improvements shall be completed, <br /> � �� approved, and warranted before the Occupancy Permit is issued. <br /> q H h 2. City streets a:�d alleys are to be kept clear of dirt and debris <br /> H �� at sll times during construction. Dust suppression and street <br /> �'" � cleaning must occur as directed by the Public Works Inspector. <br /> zyH� . <br /> t-� y z 3. Performance guarantees are required for the sidewalk, <br /> ~"� landscaping, alley and drainage improvements. <br /> y <br /> � ��' 4 . Permits must be obtained for for the placement of all earth <br /> removed from the site (if a permit has not already been obtained <br /> y �� for placement of fill on a site) . It takes about 45 days (a SEPA <br /> review) to obtain permits for any specific site for the placement <br /> of more than 500 cubic yards of earth. <br /> 5. A one-year guarantee is required on the public improvements and <br /> landscaping for an amount not less than 10� of the cost of <br /> construction and shall run for one year rrom the date of issuance <br /> of the first Occupancy Permit for the project. <br /> ���'' 6. The City will be �onstructing a new sewer force main in the alley <br /> right-of-way. The City would like a temporary construction <br /> �s easement from this site. <br /> ( 7. The correct address must be clearly posted over or near the main <br /> entrance of the building prior to occupancy to allow emergency <br /> vehicle response. <br /> 8. The City prohibits outdoor l�urning. Therefore, no fires for the <br /> � '.�' purpose of disposing of construction debris will be allowed. <br /> 9. Any security fence erected around the construction site must be <br /> located so as to not obstruct any existing hydrant, otner fire <br /> �'� � protection equipment, or any Fire Department access. If Fire <br /> "� Department access is obstructed, qates or ather openings must be <br /> provided for access. <br /> 1 ` <br /> w�,� <br /> � I <br /> � 5 <br /> I <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.