My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
201 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
201
>
201 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 10:19:50 AM
Creation date
2/26/2017 10:19:29 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
201
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��y��Ol�/ER <br /> /�(111� /E/NG/NEEAS <br /> June 22, 1994 <br /> P.U.D. No. 1 of Sn�homish County <br /> P.O. Box 1107 <br /> Everett, Washington 98206 <br /> Atteation: Mr. Jim Simpson, P.E. <br /> Project Manager <br /> Subject: Drilled Pier Construction, Pile Driving <br /> Delta Switching Station <br /> Everett, Washington <br /> Dear Jim: � <br /> As requested, we have provided construction oUservation of drilled piers and pile driving <br /> at the site of the Delta Switcfring Station in Everett, Washington. A geotechnical <br /> engineering evaluation was perfo:med by our firm for the above project and the results <br /> included in our report tided "Delta Switching Statien Yrojeat, Geotechnical Engineering <br /> Report," dated October, 1993. The scope of our servi;as w� ull-time observation during <br /> the foundation installations on the dates of June 9, 10, 1� and 16, 1994. This report <br /> includes observations during drilled pier and driven titzhP; pile installation. Also included <br /> ; in this report aze pile driving records for the project. <br /> The foundations were to be installed in compliance with t � specifications on contract <br /> drawings and in the specifications tided "Public Works Contract No. 93-778 Delta <br /> Switching Station Site Consuuctioq " Volumes one and two, date:i February 4, 1994. <br /> During the drilled pier installatioq we observed that the soil conditions were as anticipated <br /> and are consistent with ihe soil condidons indicated in the geotechnical report and <br /> encountered duriqg the geotechnical evaluation. We also observed that the concrete was <br /> placed in general compliance with the recommendapons in the geotechnical report and the <br /> project specificadons. <br /> The driven piles were to be installed to a minimum depth of five feet into the sand layer <br /> that is first encountered at an approxic�ate elevation of minus one foot. The piles were not <br /> to be driven beyond an approximate elevation of minus sixteen feet withou' further <br /> consultation. The pile cap areas were excavated to an elevation of appro�timately 14 feet <br /> (approximately five feet deep) prior to pile installation to assure that the piles could be cut <br /> at the cutoff elevations designated on the piGng plan of 1433 feet and 14.83 feet for the <br /> east and west sides of the north-south baseline "B", respectively. The piles �vere then <br /> driven approximatcly 22 feet to an elevation of-3 feet, approximately seven feet into the <br /> sand layer encountered at an approximate elevation of elevation minus one foot. <br /> PEI-}II.Y 32-139(6/S119�1350.0W <br /> 3940 Glenbrook Drive•P.O. Box 1066•Hailey, Idaho 83333•(208) 788-3456•Fax: (208)788•2082 <br />
The URL can be used to link to this page
Your browser does not support the video tag.