Laserfiche WebLink
WAC 197-11•960 FOR AGENCY <br /> SEPA ENVIRONMENTAL CHECKLIST USE ONLY <br /> PUD NO. 1 OF SNOHOMISH COUNTY <br /> 2. O.I.0 <br /> a What rypes of emissions to the air wouid result irom the proposal <br /> (ie., dust, automobile, odors, industrial wood smoke) during <br /> construction and when the project is completed? If any, generally <br /> describe and give approximate quantities if known. <br /> No emissions will be discharged during operation <br /> of the facility. <br /> There wili be some heavy equipment utilfzed <br /> during the construction phase of the facility, <br /> causing temporary increases in vehicle exhaust <br /> and dust. <br /> b. Are there any off-site sources of emissions or odor that may affect <br /> your proposal? If so, generaily describe. <br /> No. <br /> c. Proposed measures to reduce or control emissions or other <br /> impacts to air, if any: <br /> Standard exhausi and emission controls on <br /> vehicies, and sprinkling ot the site during <br /> construction, as necessary. <br /> 3. Water <br /> a Surface: <br /> 1) Is ihere any surface water body on or in the immediate vicinity <br /> oi the site (including year-round and seasonal streams, saltwater, <br /> lakes, ponds, wetlands)? If yes, describe type and provide names. <br /> It appropriate, state what stream or river it ilows into. <br /> Ths Snohomish River is located approximately <br /> 600 feet to the north. The wetiand wtll be on the <br /> northwestern end of the site. <br /> 2) Will the projecl require any work over, in, or adjacent to <br /> (within 200 feet) the described waters? It yes, please describe <br /> and attach available plans. <br /> N o. <br /> 6 <br />