Laserfiche WebLink
Street, 2nd Floor, no later than 14 days from tl�e date the MDNS becomes final (which is after the 14-day <br /> comment period). <br /> Contact Dave Tyler to rcad or ask about the rrocedures for SEPA appeals. <br /> NOTE: A DNS may be �vithdrawn in the event of significant changes in the proposal, disclosure of <br /> new significant information, misrepresentation by the applicant, or failure to comply with the <br /> conditions upon which this Determin�tion of Non-Significance is predicated. This land use <br /> permit shall temiinatc if the applicant docs not apply for a building pertnit within 18 months <br /> (or, with an extension, 24 months), except�vhere a time limit on the land use permit is <br /> othenvise established undcr federal or state law, city ordinance, or an executed development <br /> agrcemcnt. <br /> INFORMATION FOR DEVELOFER: <br /> The following information is provided for the devcloper's benefit. "Chese are not SEPA conditions but aze <br /> associatcd witli other la�vs or requirements. All requirements are preliminary in nature, and are based upon <br /> the preliminary sitc plan and the ordinances in effect at time of submittal for SEPA review. The proposal <br /> must comply with ull ordinances in effect •rt the time a complete building permit application is filed, <br /> incluJing those not specifically�et forth hcrein. (Exception: �or vesting under the 7oning Code, please <br /> rcfer to Scction 15.20.110 of th; Evcrett Municipal Code). Contact the Planning Dcpartment for information <br /> regarding appeals processes for the requirements listed in this document. <br /> 1. A 1'ublic Works Pennit is required for this project. Detailed drawings in accordance with City <br /> Dcsign and Constniction Standnrds shall bc submiucd to the Public Works Department, showing <br /> utilitics, storm drainage, tcmporary construction erosion control, and all required improvements in the <br /> public right-of-way. Public Works Department approval of these drawings is required prior to any <br /> pennits bcing issued. All improvemcnts shall be completed, approved attd warranted before the final <br /> approval is grantcd. <br /> 2. 42 fcct of right-of-way is to bc dedicatcd to the City for strcet purposes for the new street within the <br /> proposnl. Thc strect must be 28-feet curb to curb with 5-foot sidewalk on one side. 71ie alleys�vill <br /> Ue privatcly o�vned and maintained. <br /> 3. Signs stating"No Parking" must bc provided on�ne sidc of the local access street. <br /> �1. '1'l�e construction plans iuust be designcd from a site survey perfomied by a licensed State of <br /> W�shington land survcyor. <br /> 5. Soil compaction testing shall bc perfonned throughout the construction of the public street and <br /> utilities. Density curves shall bc submitted to the Public VVorks Department prior to permits being <br /> issued Cor any aspect of thc projcct. All �vork perforn�cd by the geo-tcchnical engineer or testing lab <br /> shall he reported direcdy to the City Public Works Inspector before covering �vork can be continued <br /> � %r <br /> 3 � i�/ <br /> �� <br />