Laserfiche WebLink
by the contractor. Daily reports shall be kept by the soils investigator/tester and submitted to the <br /> Public Works Inspector within 24 hours. <br /> G. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding <br /> is not practical due to weather or seasonal problems,the ground must be covered with mulch as <br /> dirccted by the City Engincer. <br /> 7. Temporary erosion control me.�sures for conswction activity must be operational prior to <br /> commenccment of any cicaring or earthwork. <br /> 8. City streets are to be kept clear of dirt and debris at all times during conslruction. Dust su;�ression <br /> and street cicviing must occur as directed by the Public Works Inspector. <br /> 9. Residenlial strcet lighting within the plat shall be approved by the City Traffic Engineer. <br /> 10. A notc must be placcd on thc final plat map tl�at all lots must be served by a gravity scwcr system. <br /> 11. Public sewcr and watcr nt�ins must be installed for the project in accordance with City Design and <br /> Construction Standards. <br /> 12 A firc hyJr.�mt (or hydrants) capable of providing the reyuircd fire 11ow must be located�vithin 350 <br /> driving fect of all residenccs in the proposed short sutxiivision. Locatioti(s)of the hydrnnt(s) must be <br /> ��PProved by thc City Pire Marsliall. 'Ilicy hydrant(s) must meet City spccification. <br /> 13. A ono-ycar guar.mlcc is rcquired on lhc public improvcment for an;m�ount not Icss than 10% of thc <br /> cosl of consln�ction and shall run for onc ycar from thc datc oC final approval. <br /> 14. As-buills of slorm sewcr, sanit.uy sc�ver, and water systems will bc rcquired to be suUmitled per City <br /> dcsigr. vid Construction 3tandards and Spccifications for Development. <br /> 15. The new walcr main must be installed per City slandards as shown on the application sitc pl:u�. <br /> 1 G. Th:.nc�v combination se�ver main must be installed per��ity slandards. <br /> 17. Payment ro fimd 340 is required iu licu of on-site detcntion, if thc downstream system has adequatc <br /> capacity. <br /> 18. Parking must be per City Zoning Code and City Design and Construclion Standazds a��d <br /> Specifications. Por the 90 single-fantily attached units, a total of 180 parkir.g spaces musl be <br /> providcd (2 per unit). Additional guesl parking shal! be provided as generally shown in the site plan. <br /> 19. A pcdestri.m ciroulation system fiir the sitc must be approved by the Planning Direclor and Tr.diic <br /> �nginccr prior to lhc issuaticc of any building perniits. Walkways must allow Ex;destrians and <br /> whecichairs to gain easy acccss from sidcwalks �u�d bus stops to building entrances through the use of <br /> paths �vhich are physicnlly sep:uated from vcl�icle trif�ic and ma�ieuvering areas. (See the city's <br /> EXHIBIT # 6 <br /> PAGE�F�3 _\ <br /> . � <br />