Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> 6i Connect side sewer per Ciry Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> S. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Slorm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must mee;wilh the Public Works Inspector lo discuss potential drainage <br /> rauting prior to beginning the project. <br /> 11. Install erosion controi measures as determined by the Public Works inspector, such as siit <br /> fence, straw bales, swaies, or erosion blankets. <br /> 12. install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion r,ontrol measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s :i05A <br /> E� 306 on this proposal's frontage as directed by the Public Wor4s Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per Cily of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to lhe street paving. <br /> 18. Contact the Water Gistrict for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan n410 is <br /> required for the parking area. �� ; � , � , ., . j , <br /> � <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-evay. <br /> 21. A sprinkier system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> a�•;ccmrcems 2� <br /> Z <br />