My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
720 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
720
>
720 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 10:37:10 AM
Creation date
2/26/2017 10:36:53 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per Cily Standard Nfi01. <br /> 5. Connecl side sewer per City Standard#'s G01, 602, 604. <br /> 6. Cw�nect ali rooftop downspouts to the side sewer. <br /> 7. Connect roo(top downspouts to lhe drainage system provided for tliis lot. <br /> g. Rooftop runo(f must he discharged to a roo(downspout infiltration system per City of EvereR Storm <br /> Manual 3-2.6.2. The approximale size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> / g./ The contractor must meet wilh Ihe Public Works Inspeclor to discuss potenlial drainage routing prior to <br /> �/ beginning the project. <br /> 10 � Install erosion control measures as determined by the Public Works inspector, sucfi as silt fence, stra�v <br /> bales, s�vales, or erosion blankets. <br /> 11. Install erosion conlrol measures per Cily of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundalion, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasling ot material is allo�ved on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> t�� No building molerials to be stacked on sidewalks and sidewalks to be kepl clean and open for <br /> pedEstrian Ireve;. <br /> 1 G. Adjust�vater meter box 1"above sidewalk grade. <br /> 17. ' Remove and repiace curb, guRer and sidewalk as per City of Everell Standard Plan #'s 305A& 30G on <br /> this proposal's frontage as direcled by tlie Public Works Inspector(i.e. all unused driveways and any <br /> broken or damac�ed area must be replaced). <br /> 1 g. Install a"ype 1 concrete driveway per Cily of Everett Standard #307. <br /> 19. Pave dri�eway from the;ront property line�ut to the street paving. <br /> 20. Contart the Waler District for connecling provisions for this building's water and <br /> sev,�ar services. <br /> 21. A catch basin as per Cily Standard Plan tW02 wilh a gas irap per Standard Plan #410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pi essure line must discharge into a privale manhole, then <br /> gravity(low across Ihe public right-of-way. <br /> 23. A sprinkler system is required for lhis building in compliance wilh lhe requiremenls of NFDA Standards <br /> 13D. <br /> PilCamm_nG <br />
The URL can be used to link to this page
Your browser does not support the video tag.