Laserfiche WebLink
i <br /> ( H�uTM nNu sn�v Puw <br /> IFOR TMe <br /> CITY OF EVERETT, PROPOSEO CITY PARK <br /> ( TASK 11 SUBSURFACE INVESTK3ATiON <br /> EVERETT, WASHINOTON <br /> !- <br /> (- I. PROJECT PERSONNEL <br /> �_ Personnsl responsible for safety at thia site aro: <br /> Project Manayer: MNody Albn <br /> 1208) 728-0744 <br /> �_ <br /> Feld Taak Manaper: Julie Macdonald <br /> (2081 728-0744 <br /> �- Site Safety Officer: Scott MlckMson <br /> I (208� �28-0�44 <br /> Responsible Health & Safety <br /> Professional: David Keller <br /> ( 12081 728-0744 <br /> Westem Division <br /> I Health and <br /> I Safety Manaper: John Danby <br /> (9161 387-8800 <br /> � This plan supplements the 40 hour clasa requtred for all Dames & Moora field personnsl <br /> workinp at hazardoua waste sites (CFR 7910.1201. This plan applies only to Dames and Moon <br /> personnel. Other contractors must develop plana for their employees. In all cases, Damss 6 Moors <br /> � personnel shali follow the safe work practices taupht in the 40 hour and annual 8 hour traininp classea. <br /> Nothinp in this plan should be inferced to conflict with that trai�inp. <br /> The Project Manaper (PM) shall contact the Site Safety Officer (SS0) at least daily to diacuss <br /> � safety and other issues. If hazardous conditions not coverod by the Heakh & Safety Plan ara <br /> encountered, the SSO shall notify the PM or FTM immediately, and the PM or FTM ahali notify the <br /> RHSP without delay. The RHSP professional shall evaluate the hazardous conditions and modify the <br /> � H&S plan as required. <br /> ( <br /> I3 <br /> 1 <br />