My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
721 E MARINE VIEW DR 2016-01-01 MF Import
>
Address Records
>
E MARINE VIEW DR
>
721
>
721 E MARINE VIEW DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2017 4:22:41 PM
Creation date
2/26/2017 10:39:12 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
721
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ( H�uTM nNu sn�v Puw <br /> IFOR TMe <br /> CITY OF EVERETT, PROPOSEO CITY PARK <br /> ( TASK 11 SUBSURFACE INVESTK3ATiON <br /> EVERETT, WASHINOTON <br /> !- <br /> (- I. PROJECT PERSONNEL <br /> �_ Personnsl responsible for safety at thia site aro: <br /> Project Manayer: MNody Albn <br /> 1208) 728-0744 <br /> �_ <br /> Feld Taak Manaper: Julie Macdonald <br /> (2081 728-0744 <br /> �- Site Safety Officer: Scott MlckMson <br /> I (208� �28-0�44 <br /> Responsible Health & Safety <br /> Professional: David Keller <br /> ( 12081 728-0744 <br /> Westem Division <br /> I Health and <br /> I Safety Manaper: John Danby <br /> (9161 387-8800 <br /> � This plan supplements the 40 hour clasa requtred for all Dames & Moora field personnsl <br /> workinp at hazardoua waste sites (CFR 7910.1201. This plan applies only to Dames and Moon <br /> personnel. Other contractors must develop plana for their employees. In all cases, Damss 6 Moors <br /> � personnel shali follow the safe work practices taupht in the 40 hour and annual 8 hour traininp classea. <br /> Nothinp in this plan should be inferced to conflict with that trai�inp. <br /> The Project Manaper (PM) shall contact the Site Safety Officer (SS0) at least daily to diacuss <br /> � safety and other issues. If hazardous conditions not coverod by the Heakh & Safety Plan ara <br /> encountered, the SSO shall notify the PM or FTM immediately, and the PM or FTM ahali notify the <br /> RHSP without delay. The RHSP professional shall evaluate the hazardous conditions and modify the <br /> � H&S plan as required. <br /> ( <br /> I3 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.