My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 MAPLE ST 2016-01-01 MF Import
>
Address Records
>
MAPLE ST
>
1130
>
1130 MAPLE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 11:40:09 AM
Creation date
2/26/2017 11:40:02 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
1130
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ( <br /> PUBLIC WORKS PERMIT COMf�IENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per Ciiy Standard #601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> �Connect all rooftop downspouts to the side sewer. <br /> e. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width _, Depth_, Length _. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11 Install erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion biankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. emove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> ' 14 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this builc!ing lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type i concrete driveway per City nf Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> '.8. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then gravity fiow across the pubiic right-of-way. <br /> 21. N sprinkler system is required for this building in compliance with the requirements of NFDA <br /> F,tandards 13D. <br /> PWCommenis <br /> /%-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.