Laserfiche WebLink
/ CLOSED C!I WORR ORDffitS RSPORT <br /> Total Utility Maintenanc0l/02/199gnt System paqe 2 <br /> - ---zs---=-__==__-- ------____-- -- <br /> Date Range :O1/09/1989 - O1/01/1998 <br /> Cti Work Order Range :0810800810000 - UT2830-30-322Pattern :*101096740052 <br /> item Range :<Blank> - W�1L3694L05 <br /> Proqram P+LL Function ALL Activity ALL __�_______� <br /> CM WORK ORDER ID:`�101096740052 (continued) � <br /> 19.98 <br /> WYE044303947 WYE 6" ALL GASKETED 12/29/1997 Z 8.a2 <br /> WYE044307047 WYE 6^ X 4" ALL GASKETED 12/30/1997 1 __________ <br /> Total Material Cost: 145.78 <br /> vehicles: Hours Cost <br /> Ip Description __________ <br /> ------ ------------ <br /> ------------------ ------ <br /> 8.00 43.20 <br /> V0003 92 FORD VAN 10.00 54.00 <br /> V0010 '92 GMC S10 PU <br /> V2062 90 NISSAN PU 2.00 10.60 <br /> 91 DODGE PU 1/2 TON 8.00 42.40 <br /> i V2086 4.00 21.20 <br /> V2113 91 CHEV 1-TON 8.00 34.72 <br /> V2142 87 CHEV FLATBED 1�.00 81.60 <br />' V2152 87 DODGE W/HOIST 4.00 43.20 <br /> V'L230 91 FORD F800 DUMP 5 YARD 8.�0 g3 .20 <br /> V2231 90 FORD DUMP 5-YAR� 2.�0 95.40 <br /> V2663 87 VACTOR 2.�p 73.80 <br /> V3507 88 CASE BACKHOE 4X4 25.00 990.00 <br /> V3603 86 CASE BACKHOE 780 20.00 96.00 <br />�� V6807 89 COMPRESSOR IR <br /> 25.00 535.00 <br /> VJ0002 93 INTERNATIONAL 10 YD 4.00 23.60 <br /> VJ0004 �95 CHEV 1-TON __________ <br /> Total Vehicle Cost: 222�•9z <br /> Work Description: <br /> ------------------- <br /> --------------------------------------- <br /> REPLI►CED 8� OF MAIN NEW STATIONING FOR 3028 ��B 19TH IS 73' SOUTH OF MAliHOLE <br /> STAND PIPEEISSATT74NITOPSOOF1STAND IPESIIS75'.SS DE SEWER3HARE 4t' DEEP•ATAPPED <br /> pgppERTY LINES. <br /> Total cost for work order 7101096740052: <br /> 4800.98 <br />