Laserfiche WebLink
���� ' � At���,e�t c <br /> ��� �� Plans Exam�ner and Inspector Checklist <br /> ay�n <br /> y �H PermiiNo. 3� S�U Address 1Z2.3 M�}P�E Sr <br /> K c� <br /> p x p Plens Examiner: Check,write in N/A,or fill in value on shaded boxes. <br /> '� y H Inspector: Check off hoxes at IeR as ilems are found lo comply. <br /> [y p� Compllance approech: (check one) �Systems analysis ❑Component periormance lldPrescriptive palh <br /> H C7 <br /> � �g Nate: Some specifics on this fortn may nol apply if <br /> H�� A) compliance approach is systems anaysis or component pertormance; <br /> B) compliance to minimum ventitalion criteria is demonstrated through engineering c�.IculaUons or pedormance testing. <br /> r H� FOUNDATION PHASE <br /> � <br /> H <br /> o C Cn ❑ Sleb:G?- /�(f�_ Ezlerior down to Irostline/slab bottom;or Intedor 24'horizontal or vertical;or,tl radlant,under enttre slab <br /> � �� ❑ Below grode exterlor well Insuletlon: R-Jl[� (It intedor—see Insu�ntlon Phase) <br /> z H Cn —' <br /> y p y ❑ Redon mltlgeUon:r.�..f�,f II locally requlred,or crawlspace venting c11V300it2 of crawl,or vents Include an operaWe damper <br /> FRAMING PHASE <br /> - --, <br /> ❑ Froming: Slandard '____jlntermedlaro � Advanced <br /> ❑ Std alr soal:solepVsubllr;rim�svirud slll;wlndow&door Irms;penetratlon-wire,olumb,duct,panitlon studs,flue,Ilght Ilxtures <br /> �� ❑ Source speclllc exheust 1ens: Slzo requlremont—bath,loundry(SOclm);kl�chen(100dm) <br /> �� - ❑ Whole houaa exheuet ten CJ_�_/�,Qc1m Irnormitlent systom has manuai 8 auto controts;Outdoor alr supply req,lor habltable rms. <br /> ❑ Integruted lorced-e�r syst�m ��I W�slde aly ducl(wllh damper)allowing behveen,35 and.5 ACH <br /> �� INSIilATION PHASE <br /> ❑ ,p_r-_-��__� WeIIIn�ulcUon(abowgrede) <br /> � ❑ �]il /� 1 Wall Ineuletlon(below gmde):Interlor wall Insuletlon <br /> .► f^— <br /> ❑ �'j-.;..�.�_T__i Floor In�ulaUon <br /> � (� ❑ ���� Celllnp Ineuletlon:Including aeic hatch <br /> ❑ ��'j0��] Veulted c�lOng IneuleUon <br /> ❑ Vepor retarders:walls,lloors,celling <br /> .� <br /> ��� ❑ Heating system type: C�(,�L-(��,� For healpumps,Ilst sizo,HSPF,and COP � `��; 4 _ _ <br /> FINAL PHASE <br /> 'M`, <br /> �w ❑ Radon monitor on slte:with Instrudlons and general Inlormatlon <br /> ❑ Thertnostal:hoal rango,55•75;AC rango,70-�5;both,55-85.Backup hoat controls prevent slmullaneous operallon of primnry sys. <br /> � - ❑ Solld fuol oppllancos:c�lass or metal doors;dlroct comb.alr source,or 4"dla.,damperEd,Indirec�source for uncond,areas <br /> ❑ Flrepleces:6"combustlon alr supply duct w/damper dlroct to Ilrebox;tlght Iilting glnss or metal doors. - <br /> ❑ DHW heatere:NAECA labol;separale power or gas shut-ofi;on R-10 pad II electrlc and In uncorxl.area orll on concrete <br /> ❑ Mechonlcel venllletlon ducts Inaulalod lo R-0:exhaust ducts�n uncondltloned ureos/supply ducls In condllloned ureas <br /> ❑ �'c__�,j�J�] HVAC ducts/plenum InsuleQon:duds In uncondltlonod areas are Insuiatod and Jo�nis are sealed � <br /> ❑ Plpe Insulatlon:R•3 br hot and cotd water pipinc�In uncondltlonad areas(Ii servlce or rodreulating,see Table 5-12) � <br /> i <br /> ❑ oround covor:6 mll black polyothylono/apprevod oqual iappod 12"at�olnts and extending to loundatlon wall �, <br /> i <br /> I <br /> i <br /> 1 <br />