Laserfiche WebLink
CLOSED CM AORR ORDERS REPORT I '� y�STING SEP 1 7 �g97• <br /> Total Utility Maintenance Management System <br /> 06/24/1997 Page 1 <br /> -------------------------------------------------- <br /> Date Range : 12/03/1900 - 06/10/1997 <br /> CM Work Order Range : 1001091070001 - PW2548-19- Pattern :7101196649347 <br /> item Range : <Slank> - WVL3694L05 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> ------------------------------------------------------------------------- <br /> CM WORK ORDER ID: 7101196649347 Title: SO .75 INCH 1329 MAPLE ST <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Function 119 Activity 664 <br /> Date Completed: 05/22/1997 <br /> Overall Craft: <br /> Issued: 04/25/1997 Issued by: Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> I Meter Reading: <br /> i Downtime: o hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> CF BWK SIELSER, WILLIAM K. 0. 00 2 . 00 40.74 <br /> UL CSG CAVANAH, SHANE G. 0. 00 4 . 00 53.92 <br /> EO GMJ GREWING, MELVIN J. 0. 00 1. 00 19. 15 <br /> DLI GRW GOULET, ROSS W. 0. 00 1. 00 8.00 <br /> DL HCG HANNA, CORY G. 0. 00 1. 00 8.00 <br /> UL S(;A SMITH, GREGORY A. 0.00 1.00 15.58 <br /> CF SRA SORGEN, ROBERT A. 0.00 1.00 20.37 <br /> WST WDT WALDEN, DAROLD T. 0.00 4 .00 84.92 <br /> Total Labor Cost: 250.68 <br /> Materials: , <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ O5/22/1997 1 8.37 <br /> ADAP34150717 ADAPTER 3/4" MIP X 1" IPS RI @ 05/22/1997 1 3.55 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 05/22/1997 1 12.89 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA @ 05/22/1997 1 15.34 <br /> ELLA34104247 ELL 3/4" 90 DEG STREET BRASS � 05/22/1997 1 1.51 <br /> METE3�089447 METER 5/8" X 3/4" NEPTUNE T-10 05 22 1997 30.6"_ <br /> N/A CONCRETE (ASSOC) 05/31 1 14 . 01 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 5 22/1997 10 2. 30 <br /> SADD42015447 SERVICE SADDLE 4" W/3/4" CCT 05/22/1997 1 9. 64 <br /> SETT34033647 SETTER COP 5/S" X 3/4" (H12'�) 05/22/1997 1 51.91 <br /> Total Material Cost: 150. 19 <br /> - I�I.- I <br /> Vehicles: <br /> ID__________ Description___________________ Hours Cost I 3�,�� � <br /> ----------- ------ ---------- <br /> V2044 88 GMC S15 1.00 5. 00 <br /> V2117 91 CHEV 1-TON HYD UNIT 4 . 00 21.20 <br /> _�':•��.r.si.;3�� <br />