Laserfiche WebLink
EXCAVATION/TRENCHING SAFETY CHECKLIST <br /> �' •- � � `'j Work order# <br /> Date(s) of work: � � , <br /> Location of work: �Y 2 ' /t'l'��� `E� �'�- <br /> Is a"Competent Person",as defined in WAC 296-155-650,in chazge of job?..........................Yes�No � <br /> Has Dial-A-Dig been called?......................................................................... <br /> .............................Yes,�No � <br /> Dial-A-Dig number Date &Time Dial-A-Dig Done <br /> Are tr�c control devices in place?................................................................. <br /> ..........................Yes•B'SIo ❑ <br /> Is trench/evacuation on the toe of a hill, slope, or neaz a retaining wall?................................... Yes ❑ No, t� <br /> (If yes, consult supervisor�r engineer for recommendations.) <br /> If trench/excavation is less than 4 feet deep aze sides stable?.....................................................Yes,�No ❑ <br /> (If not,then trench/excavation must be shored.) <br /> If trench is more than 4 feet deep is shoring in use?.... ................. ....'��.••••••••••••••••••••••••••Z'es � No � <br /> .......................... Yes � No ❑ <br /> , , <br /> Is shoring rated for depth of trench/excavation?............�... .....:.........: <br /> Is tabulated data for the shoring on the job site?............................................................. Yes ❑ No ❑ <br /> Are spoil piles and other material stored at lease 2 feet from the edge of the........................... Yes'�No 0 <br /> trench/excavation? <br /> Is water removed from the bottom of the trench/excavation7.....................................................Yes �- No ❑ <br /> Is a ladder available for entry/exit from trench/excavation?.................. .... ... .......................... Yes ❑ No ❑ <br /> , ! .�......................... Yes No <br /> Does it extend 3 feet above top of uench?...........................y •.�; •• •� yes❑ No � <br /> Is it secured at the to � . .............................................. ❑ <br /> p.............................. . Yes No <br /> Has it been inspected for defects/problems today?......................................................... � � <br /> Is there a means of communication with rescuers in the event of an accident/problem?........... Yes 0_No ❑ <br /> Are the open sides of the trench/excavation barricaded, or protected,to prevent falls?............. Yes�Q_ No ❑ <br /> Is there is a possibility of hazardous atmospheres in the trench/excavation?............................. Yes ❑ No ;, <br /> (Such as from leaking gas mains,neazby industries,work over landfills, or other situations.) <br /> If yes, is a calibrated gas detector in use?....................... .�:•••••�•�• ••••••••••••••••••••••••������••• Yes ❑ No ❑ <br /> If yes, is a means of retrieval available for workers in the tredchl�xcavation? .............. Yes ❑ No ❑ <br /> Are all workers on site aware of safety requirements for workers in trenches/excavations?..... Yes �'_ No ❑ <br /> Signature of Crew Leader: , <br /> /� jC<<y��'!'OL Date: <br /> rak.�fs n000ic�:�0.mdui�sl <br />