My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1532 MAPLE ST 2016-01-01 MF Import
>
Address Records
>
MAPLE ST
>
1532
>
1532 MAPLE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2017 12:24:47 PM
Creation date
2/26/2017 12:24:37 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
1532
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CL03ED CM WORR ORDERS REPORT <br /> Total Utility Maintenance Management System page 2 <br /> OB/29/1997 <br /> Date F.ange : 12/03/1900 - OS/08/1997 <br /> CM Work Order Ranqe :1001091070001 - UT0021-35- Pattern .*101096750314 <br /> Item Range :<Blank> - WVL3694L05 <br /> Program ALL Function ALL Activity-ALL_____________________________________ <br /> CM WORt: ORDER ID: 7101096750314 (continued) <br /> 8.00 42 .40 <br /> V2086 91 DODGE PU 1/2 TON 4 .00 21.20 <br /> V2113 91 CHEV 1-TON 1�.00 81. 60 <br /> V2152 87 DOUCE W/HOIST 3.00 31.20 <br /> V2231 90 FORD DUMP 5-YARD 1� ,00 673.20 <br /> V3603 86 CASE BACKFiOE 780 1� ,00 81.60 <br /> V6807 89 COMPRESSOR IR 6.00 311.40 <br /> VH0002 1993 VACTOR 6.00 128.40 <br /> VJ0002 93 INTERNATIONAL 10 Y� 6.00 35.40 <br /> VJ0019 ' 96 FORD 1 TON __________ <br /> Tutal Vehicle Cost: 1428. 00 <br /> Work Description: --------------'------- <br /> ----------------------------------- <br /> REPAIk SEWER CAVE IN <br /> MAIN 9 ' DEEP, SIDE SEWFR 8 ' @ PROPERTY LINE. REPLACED 8 ' OF 8" MAIN. 1' <br /> STANDPIPE. STATIONING ON MAIN REMAINS 4 + 18. REPLACED 6 ' TO PR�PERTY LINE <br /> • 2769.65 <br /> Total cost for work order 7101096750314 : <br />
The URL can be used to link to this page
Your browser does not support the video tag.