Laserfiche WebLink
INSPECTION REPORT <br />Date /—/toJ/Pertnit: 1 V 3O-S—011D <br />W7 W Contractor: <br />Si Address: 7%�✓ -_ . -- -- <br />ELECTRICAL <br />❑ Temp Service <br />[] Groundwork <br />❑ SlahlConduit <br />❑ Roughin <br />❑ Service <br />❑ Grounding <br />❑ Coihng G.id <br />❑ Electrical IF Inal <br />SITE WORK <br />❑ Footing drains <br />❑ Roof drains <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />❑ UFER ground <br />❑ Groundwork/Slab <br />❑ Footing <br />❑ Rough In <br />❑Fcundation <br />❑Ceiling Grid <br />❑ Structural Slab <br />❑ OK to insulate <br />[]Itaming <br />❑ Rooftop Units <br />nsulation <br />❑ Mechanical Final <br />❑ Drywall Nffihng <br />❑ Shear Nailing <br />❑ Roof Nailing <br />❑ Ceiling Grid <br />❑ Building Final <br />OTHER OR CONSULTATION: <br />PLUMBING <br />❑ GroundworWSlab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate. <br />❑ Water Service <br />[1 Modical Gas <br />[] Plumbing Final <br />GAS PIPE <br />Rough In/Service Hot Water Tank <br />❑ Refrige.:. ❑ Rough in <br />❑ Gas Pipe Final ❑ HWT Final <br />f lw-,�25P - iy?r <br />❑ APPROVAL ❑ PARTIALA PROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. [CTION REQUESTED ❑ <br />[] OK FOR C.O. ❑ VIOLATION <br />❑ UN PERFORM INSPECTION:- <br />LL (425) 257.8681 FOR REINSPECTION — 24 hour notice required <br />"l-I <br />Ic%or Fief- 5!G ac fit..✓ _�N C sF <br />Inspector: _ Dr <br />Date: <br />nATABAR INC. <br />