Laserfiche WebLink
CLAM <br />Plans Examiner — fill out this glazing section or attach a window schedule to this checklist. Inspector — verify window in- <br />formation during field inspections. Include skylights, glass doors and all other glazing on this form. Use rough opening <br />area for calculations. <br />Size Quantity Area U-Value/Manufacturer Verified <br />4 C G? <br />Total glazing area: <br />Total conditioned area: <br />Percentage glazing: Verifleo <br />DOORS <br />Plans Examiner — list opaque doors by type (solid core, insulated, etc.), quantity, U-value, and manufacturer. <br />Inspector — verify door Information during field inspection. <br />!Tvoe/Quantity IU-Value!Manufacturer Verlfled <br />Signature of Building Official: <br />Date of Final Inspection: 16-91 <br />