Laserfiche WebLink
3 <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />10/28/1998 Page 1 <br />Date Range :06/24/1900 - 10/28/1998 <br />CM Work Order Range :0810800810001 - UT2883- - Pattern :7101196751570 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196751570 Title: CONVERT 3C18 MCDOUGALL <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS1795X005 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 10/28/1998 <br />Overall Craft: <br />Issued: 09/23/1998 Issued by: JSM Assigned to: TDE1 <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft <br />ID <br />Name <br />Planned Hrs <br />Actual Hrs <br />---------- <br />Cost <br />----- <br />WST <br />------ <br />BHA <br />------------------------------ <br />BRADLEY, <br />BROCK A. <br />----------- <br />0.00 <br />---------- <br />5.00 <br />103.85 <br />UL <br />CSG <br />CAVANAH, <br />SHANE G. <br />0.00 <br />2.00 <br />30.48 <br />WST <br />TDE1 <br />THOMPSON, <br />DWAYNE E. <br />0.00 <br />2.00 <br />41.54 <br />HEO <br />WMF <br />WELLMAN, <br />MARK F. <br />0.00 <br />5.00 <br />104.55 <br />UL <br />WTE <br />WESTVANG, <br />TERRY E. <br />0.00 <br />2.00 <br />32.68 <br />Total Labor Cost: 313.10 <br />Materials: <br />ID <br />Description <br />Date <br /># Used <br />Cost <br />--------- <br />------------ <br />ADAP34000547 <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />-------- <br />10/14/1998 <br />-------- <br />2 <br />16.96 <br />BOX000056247 <br />BOX METER PLA 15" X 10" W/LID <br />10/14/1998 <br />1 <br />12.99 <br />BUSH32100947 <br />BUSHING 3/4" X 1/2" BRASS <br />10/14/1998 <br />1 <br />0.75 <br />COUP32137647 <br />COUPLING 1/2" COP X 3/4"MIP @ <br />10/14/1998 <br />1 <br />3.27 <br />ELL034101447 <br />ELL 3/4" 90 DEG BRASS <br />10/14/1998 <br />1 <br />1.31 <br />METE36089447 <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />10/14/1998 <br />1 <br />30.67 <br />NIPP32130947 <br />NIPPLE 1/2" CLOSE BRASS " <br />10/14/1998 <br />1 <br />0.53 <br />SETT34149747 <br />SETTER COP 5/8" X 3/4" (H711) <br />10/14/1998 <br />1 <br />41.81 <br />Total Material <br />Cost: <br />108.29 <br />Vehicles: <br />ID <br />Description <br />Hours <br />---------- <br />Cost <br />------------ <br />V2117 <br />------------------------------ <br />91 CHEV 1-TON HYD UNIT <br />------ <br />2.00 <br />10.40 <br />V2156 <br />89 DODGE 1 TON <br />5.00 <br />25.00 <br />VJ0026 <br />197 FORD 1 TON SVC TRUCK <br />2.00 <br />11.80 <br />Total Vehicle Cost: <br />47.20 <br />