My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1901 MCDOUGALL AVE 2018-01-02 MF Import
>
Address Records
>
MCDOUGALL AVE
>
1901
>
1901 MCDOUGALL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 12:53:48 PM
Creation date
2/26/2017 3:57:41 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
1901
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
everett <br />MAYOR ROBERT C. ANDEMSO" <br />BRUCE E. ]ONES, City Attorney <br />November 25, 1959 <br />1cctrical permits for Craftsmen <br />Construction Company <br />Art Palmer, Hersey Sampson and a third man (name not :mown met with Mayor <br />Anderson, i.arry Erickson rind 3utch Dougherty ,pertaining to atopping electrical wort: on <br />a house at 190i McDougall which is being renovated under a low income housing <br />program. Art Palmer stated that the men on the job were threatened with either <br />being sent to jail or stopping work. 3utch Dougherty explained that this was not the <br />case - it was merely explained to the worker'; that someone had to be responsible for <br />this work who had an electrical license and an electrical permit had to be obtained for <br />the installation. Until such person coi Id be located he told them they had to ito;) <br />wort: on the electrical installation. <br />Hersey Sampson stated that he got the building perin t and thought that with the <br />obtaining of the building permit that he was clear to eo ahead on the electrical <br />installation. Butch explained that this was not the case - that an electrical permit <br />was required and that to obtain an electrical permit it had to be by someone who <br />was under state bond and had a state electrical installation license. <br />The program which Craftsmen Construction Company, Hersey Sampson and <br />Art Palmer are working on was discussed at some length as another step toward <br />Improving the problem of urban blight, but it was explained that if the houses <br />are ':o sell in a low income bracket, that the cost of renovotion must be carefully <br />wat(hed, and further the contractor has to be aware of all of the proper steps that <br />must be taken -;o that he doesn't underestimate on his bid to renovate the house. <br />A was left that Use City would accept a-)ermit froin any licensed electrical contractor <br />who would apply for the permit on these li .ses. and hTr. Sampson would try to <br />iignsre out who had an electrical license tvho could apply for the permit. It was ilso <br />considered that perhaps i.?r. Sampson _should get his own electrical permit for this <br />and other work that he may be doing, he City would assist him in doing this. Also, <br />It was arranged that Butch and tarry Erickson would meet with h1r. Sampson or ;fir. <br />Palmer to go over some of the houses to determine how the work would have to be <br />done to brings the electrical wiring up to code. <br />B1:'i/bj <br />cc l.arry Erickson <br />notnh Vnivib arty tl-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.