Laserfiche WebLink
Pin 2 <br />Work Activity Work Order 06/20/2000 10:43 <br />Work Order Number 20000305 <br />F_OUIPMENT: <br />ID DESCRIPTION Date Unite Cost <br />MATERIAL: <br />ID <br />DESCRIPTION <br />Sub Total <br />Date Units <br />Cost <br />COUP423ODS47 <br />COUPLING 4 CLAY X 4 CVPLASTIC <br />03i292000 1.00 <br />$2.81 <br />ELL042303047 <br />ELBOW 4 BELL X SPIGOT 45 DEG P <br />0129l2000 1.00 <br />$2.20 <br />ELL044303447 <br />ELL 6 BELL X SPK:OT 45 DEG PVC <br />03r29f1000 2.00 <br />$8.58 <br />PIPE423D4147 <br />PIPE 4 PVC SEWERASTMD3034 80 <br />03129Pm 2.00 <br />$1.20 <br />PIPE443D4247 <br />PIPE 6 PVC SEWERASTMDMU 80 <br />032912000 37.00 <br />$49.80 <br />PLUG42307647 <br />PLUG 4 (PVC) SEWER BELL END <br />0329J2000 1.00 <br />$1.19 <br />PWG44307747 <br />PLUG 6 (PVC) SEWER BELL END <br />ox29/m 1.00 <br />$1.78 <br />REDU44303847 <br />REDUCER 6 SP X 4 GASKETEDGPK <br />03291M 1.00 <br />$4.27 <br />WYE044303947 <br />WYE 6 ALL GASKETEDSPK 107-M <br />0329 M 1.00 <br />$9.42 <br />WYE044307047 <br />WYE 6 X 4 ALL GASKETED(PVC) <br />032ar2000 1.00 <br />Sub Total <br />(ik) <br />MISCELLANEOUS: <br />ID <br />DESCRIPTION <br />Date Units <br />Cost <br />Sub Total $0•00 <br />