Laserfiche WebLink
1tion For <br />00�r PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 982201 259/-8810 <br />TYPE OR I RINT ONLY 0� <br />Date <br />Public Works Permit N <br />Building Permit N _ <br />Public Works Fee $ _ <br />Owner Plan Check No: C 57456 SEPA <br />Applicat.Date: 12 16 9 <br />JJob Address: DOUGALL AVE <br />Owner: COBB TINA <br />Applicant Tenant: <br />Proposed Use: SINGLE FAMILY RESIDENCE <br />Desc. of Work: <br />Describe Proposed Work _ BEDROOM / BATH ADDITION (RPII125-97) <br />OFFICE SET JOB SET <br />APPROVED FOR PERMIT: DATE_/_/_ BY <br />PROJECT ADDRESS (if known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following if applicable: <br />•Property Lines •Outline and dimensions of all existing and proposed structures on the lot •Existing and proposed utilities <br />-Centerline of s. aet •Indicate North `Show any proposed grading changes •Show measurements <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-8110-424-5555. <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />() <br />co <br />0 <br />z <br />`0 <br />rriA <br />v♦ <br />0 <br />CL <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because o' installation and maintenance of <br />the improvement or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the Chv and to replace public property <br />damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />