Laserfiche WebLink
t <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />04/07/1998 Page 2 <br />Date Range :01/09/1989 - 04/06/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101096750369 <br />Item Range :<Blank> - WVL36941,05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101096750369 (continued) <br />REDU44303847 REDUCER 6" SP X 4" GASKETED 03/23/1998 1 4.53 <br />WYE044303947 WYE 6" ALL GASKETED 03/23/1998 1 9.99 <br />Total Material Cost: 90.91 <br />Vehicles: <br />ID <br />Description <br />------------------------------ <br />Hours <br />Cost <br />V0010 <br />'92 GMC S10 PU <br />-- <br />5.00 <br />----- <br />26.50 <br />V0058 <br />198 CHEV 1/2 T 4X4 PU <br />4.00 <br />23.60 <br />V2112 <br />91 <br />CHEV 1 TON <br />3.50 <br />21.35 <br />V2113 <br />91 <br />CHEV 1-TON <br />3.00 <br />15.60 <br />V2147 <br />87 <br />CHEV 1.5 YD <br />2.00 <br />18.28 <br />V2152 <br />87 <br />DODGE W/HOIST <br />38.00 <br />182.40 <br />V2225 <br />88 <br />FORD 8YD <br />3.50 <br />53.69 <br />V2231 <br />90 <br />FORD DUMP 5-YARD <br />14.00 <br />144.20 <br />V2663 <br />87 <br />VACTOR <br />5.00 <br />239.00 <br />V3200 <br />80 <br />CASE VIBROMAX W25 ROLLER <br />3.50 <br />66.01 <br />V3603 <br />86 <br />CASE BACKHOE 780 <br />42.00 <br />1633.80 <br />V6401 <br />80 <br />CASE FLATBED TRAILER <br />3.50 <br />0.00 <br />V6807 <br />89 <br />COMPRESSOR IR <br />38.00 <br />182.40 <br />VJ0002 <br />93 <br />INTERNATIONAL 10 YD <br />28.00 <br />588.00 <br />VJ0004 <br />195 <br />CHEV 1-TON <br />3.30 <br />19.14 <br />VJ0017 <br />196 <br />FORD 5 YARD <br />3.50 <br />54.18 <br />VJ0018 <br />196 <br />FORD 5 YARD <br />2.00 <br />30 96 <br />Total <br />Vehicle Cost: <br />3299.11 <br />Work Description: <br />---------------------------------------------- <br />----------------------------- <br />10" CLAY MAIN p 12' DEEP. RENEWED SERVICE WITH PVC TO EAST SIDE OF SIDEWALK <br />(3' DEEP AT PROPERTY LINE) CHART WAS INCORRECT -SHOWING HOOKUP AT 1 + 68 <br />ACTUAL POINT IS 1 + 93 - MON MAIN REPLACED. <br />Total cost for work order 7101096750369: 6650.28 <br />