Laserfiche WebLink
CLOSED CM WORR ORDBRS REPORT <br />Total Utility Maintenance Management System <br />06/22/1998 Page 1 <br />________________________________________________________________________________ <br />Date Range :O1/09/1989 - 06/22/1998 <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern :7101196751468 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL A�:tivity ALL <br />________________________________________________________________________________ <br />CM WORK ORDER ID: 7101196751468 Title: REPAIR 2222 MCDOUGAL AVE <br />« DUPLZCATE PRINTING OF THIS WORK ORDER» <br />Item ID: WS2095L002 -- WATER SERVICE <br />Locatior. ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 06/08/1998 <br />Overall Craft: <br />Issued: 06/OS/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />_ Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Labor: <br />Craft ID Name Planned Hrs Actual Hrs <br />----- ------ ------------------------------ ----------- ---------- <br />UL CSG CAVANAH, SHANE G. 0.00 4.00 <br />WST TDE1 THOh1PSON, DWAYNE E. 0.00 4.00 <br />Materials: <br />ID <br />ADAP34000547 <br />ADAP34000647 <br />BOX000056247 <br />COUP34135447 <br />COUP34142747 <br />ELL034101447 <br />ELL034104247 <br />SETT34149747 <br />Vehiclea: <br />ID <br />VJ0026 <br />Description <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE� <br />ADAPTER 3/4" FIP X INSTA-TITEJ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" MIP X 1j2"CTSPJ� <br />COUPLING 3/4" CTS COMP X MIPT@ <br />ELL 3/4" 90 DEG BRASS " <br />ELL 3/4" 90 DEG STREET BRASS " <br />SETTER COP 5/8" X 3/4" (H7") <br />Description <br />'97 FORD 1 TON SVC TRUCK <br />Total Labor Cost: <br />Date <br />u6/08/1998 <br />06/08/1998 <br />06/08/1998 <br />06/08/1998 <br />06/08/1998 <br />06/08/1998 <br />06/OB/1998 <br />06/08/1998 <br /># Used <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Hours <br />4.00 <br />Cost <br />23.60 <br />Total Vehicle Cost: 23.60 <br />Cost <br />58.04 <br />82.48 <br />140.52 <br />Cost <br />25.23 <br />7.67 <br />12.94 <br />4.04 <br />4.10 <br />1.31 <br />1.62 <br />38.66 <br />95.57 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />1/2" CURB STOP DOESNT SHUT WATER OFF COMPLETELY <br />