Laserfiche WebLink
4( <br />Page 2 <br />Work Activity Work Order O8/20/2003 15:0'. <br />Work Order Number 20031746 <br />EQUIPMENT: <br />ID DESCRIPTION Date Units Cost <br />Sub Total <br />MATERIAL: <br />ID <br />DESCRIPTION <br />date Units <br />Cost <br />BRIC00061156 <br />BRICK, 2-1/4 X 4 X B GREY CONC <br />001003 24.OD <br />$6.12 <br />CEME00061438 <br />CEMENT 20 MINUT, c SET 50 I.B. BA <br />001003 3.00 <br />$35.51 <br />Sub Total <br />t4t.83 <br />MISCELLANEOUS: <br />ID <br />DESCRIPTION <br />Date Units <br />Cost <br />Sub Total <br />-- $0.00 <br />