My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2915 MCDOUGALL AVE 2016-01-01 MF Import
>
Address Records
>
MCDOUGALL AVE
>
2915
>
2915 MCDOUGALL AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 10:54:54 AM
Creation date
2/26/2017 5:12:07 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
2915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />PUBLIC WORKS PE,R,MIT COMMENTS <br />1. Connect side sewer per City Standard #'s 601, 602, 604. <br />2. Connect all rooftoo downspouts to ihe side sewer. <br />3. Connect rooftop downspouts to the drainage system provided for this Ict. <br />4 The contractor must meet with the P�blic Works Inspector to discuss a storm water system pnor to <br />beginning the prcject. Call Randy Allen at 425-339-74031Ca11 CGff Lindman al 425-339-7404. <br />5 Install erosion control measures as determined by the Pubtic Works inspector, such as silt fence, slraw <br />bales, swales, or erosion olankets. <br />6. Install erosion control measures per City of Evereri Standards for small parcels <br />7. Remove erosion control measures upon cumpletion ot the project prior to finai appmval oi the permit. <br />B. All excavated material from foundation, sidewalk and driveways shail be hauled to an approved, <br />permitted site No wasting of material is allowed on this buifding lot. <br />9. No dirt, mud, rocks or debris to be tracked onto roaGway. <br />10 No building materiais to be stacked on sidewalk/roadway and sidewallu'roadway to be kept ctean and <br />open for pedestrian travel. <br />11. Adjust waler meter box 1" above sidewalk grade. <br />12. Remove and replace curb, gutter and sidewalk as per City o( Everelt Standard Plan i+'s 305A 8 306 on <br />this proposal's frontage as directed by lhe Public Works Inspeclor (i.e. all unused uriveways and any <br />broken or damaged area must be replaced). <br />13. Install a Type I concrete dnveway per Citv uf Everett Standard #307. <br />14. Pave dnveway irom the `rcnt property line out to the street paving <br />15. Pave to existing paving in alley. <br />16 Contact the Water District for connecting provisions for this bwlding's water and <br />sewer services. <br />17. A catch basin as per City Standard Pl�n ,1402 with a gas Irap per Standard Plan it410 is required for the <br />parking area. <br />18. If a sewer pump system is to be mstalled, the pressure line must discharge into a private manhole, then <br />gravity flow across the public right-of-way. <br />19. A sprinkier �ystem is required for this building in compfiance with ihe reqwremenis of NFPA Standards <br />13D. <br />Your Pubiic Works Inspector is Cliff Lindman. Call 425-339-7404 for any questions andlor inspections. <br />_.----- <br />�our Public Works Inspector is Randy Allen. Call 425-339-7403 for any questions andlor inspections. <br />FENCE <br />#. In the event ihat the City needs to access ihe right of way, it will be the owner's responsibility to remove ihe <br />fence at their expense. <br />PWComments 1 Revis:a 11/212013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.