Laserfiche WebLink
e <br />INFOAMATION FOR DEVELOPER <br />7. Detailed draxings in accordance xith city design and construction <br />standards shall be submitted to the Public Works Department showing <br />site parking layout, landscaping, utilities, storm drainage, temporary <br />construction erosion control, and all required improvements in Lhe <br />public right-of-i.ay. Public Works Department approval of these <br />draWings is required prior to ar.y permits being issued. All <br />improvements shall be eompleted� approved� and warranted before the <br />oceupaney Permit is issued. <br />2. City streets and alleys are to be kept elear of dirt and debris at all <br />times ciuring construetion. Dust suppression and street eleaning must <br />occur as directed by the Public Works Inspector. <br />3. Per'�rmance guaranti:es are required for street and landseaping <br />improvements. <br />4. A c.ie-year guarantee 2s required on <br />landseaping for an amount not less than <br />and shall run for one year from the <br />Occupaucy Permit for the project. <br />the public street and side <br />10� of the cost of construetion <br />date of issuance of the first <br />