My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3409 MCDOUGALL AVE 2018-01-01 MF Import
>
Address Records
>
MCDOUGALL AVE
>
3409
>
3409 MCDOUGALL AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 7:46:54 AM
Creation date
2/26/2017 5:51:55 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
3409
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO � 6oU Landies, Planning Dep.�rYment <br />FROM PuUlic H'orks Depar.tm�nyy� �/�/� <br />DATE 9_4_8� <br />sue�ecr S.E.P.A. Checklist Reviea� �SO/il <br />CITV OF EVERETT, EVER[TT WASHINGTON <br />PROPOSAL: <br />Const n�.ction of S 200 sq. ft. warehouse addition to nn existing <br />wareltocse facility Bast of DtcUougall F, North of 34th Street. <br />RECOMMGNDATIONS: <br />It is the recommendation of the Public liorks Ile��artment tl�at issuancc <br />of a Negative Declaration Ue suUject to the following: <br />1. A de:ailed drawing shall be suhmitted to the ('ublic Works <br />Department showing parkinP layout, landscaping, driveways <br />utilities, storm drainage, and all required improvements <br />to tlie puUlic right-of-�aay. PuUlic H'orks Department approval <br />of these drawings is requircd Ueforc any permits are issned. <br />All improvements shall be completed Uefore the Occupancy <br />Permit is i.ssuccl. <br />As-Uuilts, casement, and a one year iV�rranty Bond in tlic amount <br />of 10% of the cost of construction of the puUlic uater system <br />arc required within 10 wori.inr days of obtaining public r+atcr <br />cunnection. <br />2, City strcets are to he kept clear of dirt and deUris during <br />construction. <br />s. l.h�rini[ constniction, all truc): traffic to and from thc site <br />within the City of Evcrett shall Ue on arterial streets unless <br />otherMisc approved Uy tlie Fublic 19orks Department. <br />4. Part¢cipation in the c�st to fund rapit:a] imnrovemems to tl�e <br />nort:i end sewer system is required. <br />The APPROXID!ATE cost based on the preliminary information proeided <br />is �14?.04 as of 9-3-50. The actual cost shall Ue computed Uy <br />Ute BuildinF Departncnt per the ordinance in cffect at the time <br />anJ according to the inPormation proviJed on the aPproved plans <br />on the date of rermit issuance. <br />5. On-site d�teution is uut required. A tcmporary erosion and <br /><edimentation control plan must he approved by the Public laorks <br />Department hePore any cicaring, gradinp or othcr sicc prc��xration <br />c�.n 'begin. Draina�.e calculations to be sutmitted on City Dr�inage <br />['I.a�i suL•mission fo�7n. Resceding of eaposed cart:�� is required within <br />30 days of completi.on o£ earth work. <br />D:rainage facilitics should Le dcveiopeS to transfer st.rn run-off <br />to combined system by npproved methods. <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.