Laserfiche WebLink
a'. <br />Work Activity Work Order <br />Page 3 <br />12/19/2CJ8 5:29 <br />Issued By AGA AHLES, GREGORY A. <br />Issued Department Pw PUBLIC WORKS <br />Dale Issued 912412008 <br />Fund 401 Account 5 Program 710 Function 123 Activity 673 <br />Program <br />Title REPLACE 3620 MCDOUGALL AVE 710123673 <br />Work Order No 20080856 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 9/2412008 Time 16:08 Original WO Billing <br />Vehicle Costs <br />Type <br />Vehicle No <br />Description <br />Hours <br />Cost <br />Billing Date Billing Code <br />Warehouse <br />V <br />J0062 <br />02 FREIGHTLINER DUMP 5 YARD <br />9 <br />123.3 <br />0925/2008 <br />V <br />0087 <br />1999 CHEV 1/2 TON 4X4 <br />2 <br />13 <br />09/252008 <br />V <br />H0024 <br />2000 JOHN DEER 4X4 BACKHOE <br />9 <br />477.9 <br />091252008 <br />V <br />J0080 <br />2007 1.5 TON FORD <br />9 <br />97.2 <br />09252008 <br />V <br />J0062 <br />02 FREIGHTLINER DUMP 5 YARD <br />4 <br />54.8 <br />09126/2008 <br />V <br />J0019 <br />1996 FORD 1 TON <br />2 <br />15 <br />09/26/2D08 <br />V <br />0087 <br />1999 CHEV 112 TON 4X4 <br />2 <br />13 <br />09/2612008 <br />V <br />H0024 <br />2000 JOHN DEER 4X4 BACKHOE <br />6 <br />318.6 <br />092612008 <br />V <br />H0028 <br />2003 VACTOR <br />2 <br />66.2 <br />09126/2008 <br />V <br />J0080 <br />2007 1.5 TON FORD <br />6 <br />64.8 <br />09126/2008 <br />V <br />J0054 <br />00 FREIGHTLINER FL70 5 YO DUMP <br />2.5 <br />40.25 <br />09292008 <br />V <br />J0056 <br />01 FORD 1 1/2 TON SERVICE TRUC <br />2.5 <br />21.5 <br />0929/2008 <br />Total Vehicle Cost <br />$1,305.55 <br />Material Costs <br />1 ype <br />Mater No <br />Description <br />Quantity <br />Cost Billing Date Billing Code Warehouse <br />t.1 <br />PIPE50304547 <br />PIPE 12 PVC SEWER ASTMD-303I <br />32 <br />268.032 092612008 <br />PAN <br />Total Material <br />Cost 5268.03 <br />NA Costs <br />Type <br />Na No <br />Description _ <br />Quvltlt� <br />Cost <br />Billing Dale Billing Code <br />Warehouse <br />NA <br />NIA <br />12 S X G 90 ELBOW <br />t <br />140 <br />092612008 <br />NA <br />NIA <br />ASPHALT (CEMEX) <br />114.82 <br />10/04/2008 <br />NA <br />NA/ <br />CONCRETE (CEMEX) <br />t <br />71.35 <br />101042008 <br />NA <br />N/A <br />CONCRETE (CEMEX) <br />t <br />428.1 <br />10/04/2008 <br />Total <br />NA Cost <br />$754.27 <br />