Laserfiche WebLink
r <br />D. SECTIONS Atyr� ELEVATION <br />--�Usable space under floors <br />Guardrail consWction <br />Wali assemblies and consWction (azea/occupancy� sep�tio�� <br />—J� Floor/ceiling assemblies and construction <br />�Roof/ceiling assemblies and construction <br />Fire blocking <br />ti Parapets per 709.4 <br />Insulation per calcula6ons or Energy Code <br />HEAT SOURCE Gas_� <br />Slab edge <br />Wall <br />Floor <br />Roof <br />Windows <br />Window azea <br />Doors <br />Skylights <br />Electric Semi-heated <br />H WN <br />Below grade walls <br />Slab edge <br />Wall <br />Floor <br />Roof <br />Windows <br />Window area <br />Doors <br />Skylights <br />� Wall bracing for partiai height wai'� <br />Corridor secdon <br />Equipment seismic bracing <br />F& T ratings for rated wall/ceiling/floor penetrations <br />Exterior stair proximity to windows <br />Safety glass <br />E. REFLECTED EILIN � PLAN <br />I.�/fi0 <br />i .%1! <br />1/ <br />,ri: <br />✓/' <br />✓/.� <br />�/: <br />Light fix!ures and wattages <br />Lighting energy budget calculations <br />Light switching per W,S.E.C. (daylighting, number of lights per circuit) <br />Draft stops <br />Atdc/roof access <br />Exit signage and lighting (emergency power) <br />Seismic bracing <br />Smoke/heat vents <br />Draft curtains <br />F. ROOF PLAN <br />� Roof access [stair 1006.14j and mechanical per UMC <br />Ventilation <br />Rainwater drainage and overtlow <br />� Roof covering class <br />Skylight glazing <br />�� Roof slope <br />Mechanical equipment compliance with W.S.E.C. <br />m-pl�ncic Rev: July �7, 1995 <br />