My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 W MARILYN AVE 2016-01-01 MF Import
>
Address Records
>
W MARILYN AVE
>
10
>
10 W MARILYN AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 1:10:37 PM
Creation date
2/26/2017 6:25:33 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARILYN AVE
Street Number
10
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T0: Dennis Gableman . <br />FROM: Larry Callahan ���� <br />DATE: May 13, 1981 <br />SUBJECT: R/W Use Permits - Craig Dunney Constru�tion <br />8 W. Marilyn n79/287 <br />10 W. htai•ilyn �79/288 <br />16 W. Marilyn �f79/2£39 <br />18 W. Dtarilyn �79/290 <br />The above referenced R/W Use Permits weie issued on 10/10/79 along with <br />Building Permits to construct four (4) single family residential structures <br />at tF.e above referenced addresses. <br />Construction commenced sliortly thereaftei� on the single family residzntial <br />structures and, in the interim, the construction permits have expired as <br />�•iork ceased for a period of time in excess of one (1) year. <br />If new construction permits are to b� issued to complete the structures <br />by someone else other than the origir:al af�plicant, what would Public 4lorks' <br />stand be? <br />If new R/W Use Permits are to be reauired for the new oo-+ner/contractor, <br />will there be any additional requirements or conditions than those ori9inally <br />placed by Public Works at thc time the first R/W Use Permits a+ere issued? <br />If there are additional requirements or conditions, what will they be? <br />If a memo can be drafted outlining any ne�•+ requirements or conditions for <br />the R/4! Use Permits, copies will be put in each building permit file for <br />the above referenced addresses. This office will then be aware of the <br />additional Public Works concerns and, prior to the issuance of new construction <br />permits, the applicant/contractor can he directed to your office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.