My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 W MARILYN AVE 2018-01-02 MF Import
>
Address Records
>
W MARILYN AVE
>
18
>
18 W MARILYN AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2022 8:57:25 AM
Creation date
2/26/2017 6:32:54 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARILYN AVE
Street Number
18
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: Dennis Gableman 1 <br />FROM: Larry Callahan Y46 <br />DATE: May 13, 1981 <br />SUBJECT: R/W Use Permits - Craig Bunney Construction <br />8 W. Marilyn n79/287 <br />10 14. Marilyn n79/288 <br />16 W. Marilyn #79/289 <br />18 W. Marilyn 0 9/290 <br />The above referenced R/W Use Permits were issued on 10/10/79 along with <br />Building Permits to construct four (4) single family residential structures <br />at the above reference) addresses. <br />Construction commenced shortly thereafter on the single family residential <br />structures and, in the interim, the construction permits have expired as <br />work ceased for a period of time in excess of one (1) year. <br />If new construction permits are to be issued to complete the structures <br />by someone else other than the original applicant, what would Public Works' <br />stand be? <br />If new R/W Use Permits are to be required for the new owner/contractor, <br />will there be any additional requirements or conditions than those originally <br />placed by Public Works at the time the first R/W Use Permits were issued? <br />If there are additional requirements or conditions, what will they be? <br />If a memo can be drafted outlining any new requirements or conditions for <br />the R/W Use Permits, copies will be put in each building permit file for <br />the above referenced addresses. This office will then be aware of the <br />additional Public Works concerns and, prior to the issuance of new construction <br />permits, the applicant/contractor can be directed to your office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.